Revised Code of Washington
Chapter 60.24 - Lien for Labor and Services on Timber and Lumber.
60.24.070 - Period covered by stumpage lien.

RCW 60.24.070
Period covered by stumpage lien.

The person granting the privilege mentioned in RCW 60.24.035 is only entitled to the lien as provided therein for saw logs, spars, piles and other timber cut during the eight months next preceding the filing of the claim, as herein provided in RCW 60.24.075.

[ 1893 c 132 § 6; RRS § 1167. Prior: Code 1881 § 1946; 1877 p 217 § 8.]