Revised Code of Washington
Chapter 47.28 - Construction and Maintenance of Highways.
47.28.090 - Opening of bids and award of contract—Deposit.

RCW 47.28.090
Opening of bids and award of contract—Deposit.

At the time and place named in the call for bids the department of transportation shall publicly open and read the final figure in each of the bid proposals that have been properly filed and read only the unit prices of the three lowest bids, and shall award the contract to the lowest responsible bidder unless the department has, for good cause, continued the date of opening bids to a day certain, or rejected that bid. Any bid may be rejected if the bidder has previously defaulted in the performance of and failed to complete a written public contract, or has been convicted of a crime arising from a previous public contract. If the lowest responsible bidder fails to meet the provisions or specifications requiring compliance with chapter 39.19 RCW and the rules adopted to implement that chapter, the department may award the contract to the next lowest responsible bidder which does meet the provisions or specifications or may reject all bids and readvertise. All bids shall be under sealed cover and accompanied by deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent of the amount of the bid, and a bid shall not be considered unless the deposit is enclosed with it.

[ 1985 c 242 § 3; 1983 c 120 § 17; 1971 ex.s. c 21 § 2; 1961 c 13 § 47.28.090. Prior: 1955 c 83 § 1; 1949 c 64 § 1; 1937 c 53 § 37; Rem. Supp. 1949 § 6400-37.]
NOTES:

Effective date—Applicability—Severability—Conflict with federal requirements—1983 c 120: See RCW 39.19.910 and 39.19.920.


Office of minority and women's business enterprises: Chapter 39.19 RCW.

Structure Revised Code of Washington

Revised Code of Washington

Title 47 - Public Highways and Transportation

Chapter 47.28 - Construction and Maintenance of Highways.

47.28.010 - Latitude in selecting route.

47.28.020 - Width of right-of-way.

47.28.025 - Description and plan of new or limited access highway—Recording.

47.28.026 - Description and plan of new or limited access highway—Buildings and improvements prohibited, when.

47.28.030 - Contracts—State forces—Monetary limits—Small businesses, veteran, minority, and women contractors—Rules—Work on ferry vessels and terminals, ferry vessel program.

47.28.035 - Cost of project, defined.

47.28.040 - Precontract preparation of maps, plans, and specifications—Filing.

47.28.050 - Call for bids.

47.28.060 - Copy of map, plans, etc.—Charge.

47.28.070 - Form of bid—Data required—Requirements—Refusal to furnish form—Appeal.

47.28.075 - Financial information not open to public inspection.

47.28.080 - Withdrawal of bids—New bids—Time fixed in call controls.

47.28.090 - Opening of bids and award of contract—Deposit.

47.28.100 - Failure or rejection of bidder.

47.28.110 - Sureties—Qualifications—Additional sureties.

47.28.120 - Actions for labor and materials—Limitation of action.

47.28.140 - Highway, public transportation improvements, flood damage prevention—Cooperative agreements.

47.28.150 - Underpasses, overpasses constructed with federal funds—Maintenance cost apportionment.

47.28.170 - Emergency protection and restoration of highways and repair or replacement of structurally deficient state bridges.

47.28.220 - Compost products.

47.28.241 - Alternative delivery of construction services—Definitions.

47.28.251 - Alternative delivery of construction services—Financial incentives—Private contracting—Reports.

47.28.260 - Reciprocal agreement—Waiver of indirect costs.