RCW 47.28.040
Precontract preparation of maps, plans, and specifications—Filing.
Before entering into any contract for the construction, alteration, repair, or improvement of any state highway the department shall cause the highway to be surveyed throughout the entire length of the proposed construction, alteration, repair, or improvement and cause to be prepared maps, plans, and specifications, together with an estimate of the cost of the proposed work, and such information and directions as will enable a contractor to carry them out. The maps, plans, specifications, and directions shall be approved by the department and a copy thereof filed permanently in the department's office.
[ 1984 c 7 § 167; 1961 c 13 § 47.28.040. Prior: 1937 c 53 § 32, part; RRS § 6400-32, part.]
Structure Revised Code of Washington
Title 47 - Public Highways and Transportation
Chapter 47.28 - Construction and Maintenance of Highways.
47.28.010 - Latitude in selecting route.
47.28.020 - Width of right-of-way.
47.28.025 - Description and plan of new or limited access highway—Recording.
47.28.035 - Cost of project, defined.
47.28.040 - Precontract preparation of maps, plans, and specifications—Filing.
47.28.060 - Copy of map, plans, etc.—Charge.
47.28.070 - Form of bid—Data required—Requirements—Refusal to furnish form—Appeal.
47.28.075 - Financial information not open to public inspection.
47.28.080 - Withdrawal of bids—New bids—Time fixed in call controls.
47.28.090 - Opening of bids and award of contract—Deposit.
47.28.100 - Failure or rejection of bidder.
47.28.110 - Sureties—Qualifications—Additional sureties.
47.28.120 - Actions for labor and materials—Limitation of action.
47.28.150 - Underpasses, overpasses constructed with federal funds—Maintenance cost apportionment.
47.28.241 - Alternative delivery of construction services—Definitions.