Ohio Revised Code
Chapter 6131 | Single County Drainage Improvements
Section 6131.47 | Notice to Remove or Alter Obstruction.

Effective: March 24, 2021
Latest Legislation: House Bill 340 - 133rd General Assembly
(A) The county engineer shall evaluate all culverts and bridges, except those on state and federal highways, for adequacy of capacity, vertical and horizontal alignment, and stability. The county engineer shall schedule any bridge or culvert that does not conform with the design of the drainage improvement for removal and replacement or repair as the engineer considers necessary.
(B) If the county engineer determines that the culverts and bridges were adequate in capacity or vertical and horizontal alignment at the time of their installation, the removal and replacement shall be made at the expense of the project less any costs, which shall be apportioned by the engineer, for correction, maintenance, or replacement of the culvert or bridge in whole or in part due to deterioration or instability had the structure been left in place. The latter costs shall be specially assessed to the owner.
(C) The county engineer shall schedule in the project plans any culvert or bridge, except those on state and federal highways, that is washed out in whole or part, but that otherwise meets the requirements of the drainage improvement, for such repairs, additions, or other corrective measures necessary to preserve the bridge or culvert. The costs shall be assessed to the appropriate owner.
(D) Fences and floodgates impeding the flow of water shall be removed as a part of the drainage improvement. Replacement may be made by the owner, provided that prior written approval is obtained from the county engineer.
(E) The county engineer shall cause notice to be given to the owner not later than seven days in advance of removal or alteration of a culvert, bridge, fence, or floodgate.
(F) Any owner may furnish the work and material in lieu of a special assessment, provided the owner does all of the following:
(1) Makes written application to the county engineer within ten days after the final hearing;
(2) Furnishes the work and materials in accordance with the specifications for the improvement;
(3) Performs the work so as not to delay the project contractor;
(4) Completes the work prior to the completion of the work on the whole improvement.
(G) If the owner defaults on any or all of these conditions, the county engineer shall recommend to the board of county commissioners that the default be completed by an extra work order to the project contractor and its cost assessed to the owner.

Structure Ohio Revised Code

Ohio Revised Code

Title 61 | Water Supply-Sanitation-Ditches

Chapter 6131 | Single County Drainage Improvements

Section 6131.01 | Single County Drainage Improvement Definitions.

Section 6131.02 | Authority of County Commissioners to Construct Ditch Improvements.

Section 6131.03 | Co-Ordinating System of Water Conservation and Flood Control.

Section 6131.04 | Petition for Construction of Single County Drainage Improvement.

Section 6131.05 | Petition Amendments.

Section 6131.06 | Bond to Be Filed With Petition.

Section 6131.061 | Record Keeping.

Section 6131.07 | Notice and Hearing on Petition.

Section 6131.08 | Comments on Petition.

Section 6131.09 | Preliminary Report by County Engineer.

Section 6131.10 | Viewing of Premises.

Section 6131.101 | First Hearing on Petition for Proposed Drainage Improvement.

Section 6131.11 | Dismissal of Petition - Appeal.

Section 6131.12 | Grant of Petition.

Section 6131.13 | Consolidation of Petitions.

Section 6131.14 | County Engineer's Duties.

Section 6131.15 | Schedule of Assessments.

Section 6131.16 | Notice of Assessments and Final Hearing.

Section 6131.17 | Exceptions to Engineer's Schedules of Assessments.

Section 6131.19 | Hearing on Compensation or Damages.

Section 6131.20 | Final Hearing.

Section 6131.21 | Factors to Be Considered by Commissioners at Final Hearing.

Section 6131.22 | Approval and Confirmation of Assessments.

Section 6131.23 | Semiannual Installments for Payment of Assessments.

Section 6131.24 | Preliminary Steps for Receiving Bids for Drainage Improvements.

Section 6131.25 | Appeals.

Section 6131.27 | Transcript of Order for Drainage Improvement.

Section 6131.28 | Joinder and Separation of Appeals.

Section 6131.30 | Appeal Procedure in Common Pleas Court.

Section 6131.31 | Procedures for Findings on Appeal.

Section 6131.32 | Right of Trial by Jury.

Section 6131.33 | Jury Verdict Form.

Section 6131.34 | Costs and Fees.

Section 6131.36 | Certification of Transcript of Common Pleas Proceedings to County Commissioners.

Section 6131.37 | Bids for Drainage Improvements.

Section 6131.38 | Bid Requirements.

Section 6131.40 | Acceptance of Bids.

Section 6131.41 | Contracts for Drainage Improvement.

Section 6131.42 | Actions Against Contractor and Bondsmen.

Section 6131.43 | Assessments for Drainage Improvements.

Section 6131.45 | Extending the Contract Time.

Section 6131.46 | Supervision and Inspection of County Engineer or Deputy.

Section 6131.47 | Notice to Remove or Alter Obstruction.

Section 6131.50 | General Drainage Improvement Fund.

Section 6131.51 | General Drainage Improvement Fund Payments.

Section 6131.52 | Tax Levy for Drainage Improvements by County Commissioners.

Section 6131.53 | Tax Levy for Drainage Improvements by Township Trustees.

Section 6131.54 | Tax Levy for Drainage Improvements by Board of Education.

Section 6131.55 | Rights and Remedies of Owner Who Has Not Received Notice.

Section 6131.58 | Fees.

Section 6131.59 | Drainage Improvement - Public Watercourse.

Section 6131.60 | Personal Interest of County Commissioner.

Section 6131.61 | Oath of Witnesses.

Section 6131.63 | Written Agreement for Construction of Drainage Improvement.

Section 6131.631 | New Single Span Bridge or Culvert or Extension of Existing Culvert Limiting Future Deepening of Public Watercourse.

Section 6131.64 | Vacation of Ditch or Drain.