Effective: April 9, 1981
Latest Legislation: House Bill 268 - 113th General Assembly
The county engineer shall prepare the documents as specified in section 6131.24 of the Revised Code. If the improvement requires both labor and material that is used in and remains a part of the improvement, the bids referred to in section 6131.37 of the Revised Code shall state separately the bidder's offer upon each and for each bid item indicated on the form. If the plans or specifications do not name a specific grade, quality, kind, or size of any material of which different standard grades, qualities, kinds, or sizes are used, then the bids shall specify the grade, quality, kind, or size proposed to be furnished. Unless the specifications otherwise provide, all bids for material shall be considered to be for delivery at the location of the improvement and at such place as is designated by the engineer in charge of the work, except that tile or pipe of any kind shall be along the line of the improvement where the same are to be used, provided the location is accessible. Any bidder may submit a bid for any portion of the improvement that is the subject of a special estimate, whether of construction or material, providing it is for work or material that can be done or furnished independently of other work or material.
The bid form shall indicate the time that the contract shall be completed or be left blank for the bidder to establish such a time.
Structure Ohio Revised Code
Title 61 | Water Supply-Sanitation-Ditches
Chapter 6131 | Single County Drainage Improvements
Section 6131.01 | Single County Drainage Improvement Definitions.
Section 6131.02 | Authority of County Commissioners to Construct Ditch Improvements.
Section 6131.03 | Co-Ordinating System of Water Conservation and Flood Control.
Section 6131.04 | Petition for Construction of Single County Drainage Improvement.
Section 6131.05 | Petition Amendments.
Section 6131.06 | Bond to Be Filed With Petition.
Section 6131.061 | Record Keeping.
Section 6131.07 | Notice and Hearing on Petition.
Section 6131.08 | Comments on Petition.
Section 6131.09 | Preliminary Report by County Engineer.
Section 6131.10 | Viewing of Premises.
Section 6131.101 | First Hearing on Petition for Proposed Drainage Improvement.
Section 6131.11 | Dismissal of Petition - Appeal.
Section 6131.12 | Grant of Petition.
Section 6131.13 | Consolidation of Petitions.
Section 6131.14 | County Engineer's Duties.
Section 6131.15 | Schedule of Assessments.
Section 6131.16 | Notice of Assessments and Final Hearing.
Section 6131.17 | Exceptions to Engineer's Schedules of Assessments.
Section 6131.19 | Hearing on Compensation or Damages.
Section 6131.20 | Final Hearing.
Section 6131.21 | Factors to Be Considered by Commissioners at Final Hearing.
Section 6131.22 | Approval and Confirmation of Assessments.
Section 6131.23 | Semiannual Installments for Payment of Assessments.
Section 6131.24 | Preliminary Steps for Receiving Bids for Drainage Improvements.
Section 6131.27 | Transcript of Order for Drainage Improvement.
Section 6131.28 | Joinder and Separation of Appeals.
Section 6131.30 | Appeal Procedure in Common Pleas Court.
Section 6131.31 | Procedures for Findings on Appeal.
Section 6131.32 | Right of Trial by Jury.
Section 6131.33 | Jury Verdict Form.
Section 6131.34 | Costs and Fees.
Section 6131.36 | Certification of Transcript of Common Pleas Proceedings to County Commissioners.
Section 6131.37 | Bids for Drainage Improvements.
Section 6131.38 | Bid Requirements.
Section 6131.40 | Acceptance of Bids.
Section 6131.41 | Contracts for Drainage Improvement.
Section 6131.42 | Actions Against Contractor and Bondsmen.
Section 6131.43 | Assessments for Drainage Improvements.
Section 6131.45 | Extending the Contract Time.
Section 6131.46 | Supervision and Inspection of County Engineer or Deputy.
Section 6131.47 | Notice to Remove or Alter Obstruction.
Section 6131.50 | General Drainage Improvement Fund.
Section 6131.51 | General Drainage Improvement Fund Payments.
Section 6131.52 | Tax Levy for Drainage Improvements by County Commissioners.
Section 6131.53 | Tax Levy for Drainage Improvements by Township Trustees.
Section 6131.54 | Tax Levy for Drainage Improvements by Board of Education.
Section 6131.55 | Rights and Remedies of Owner Who Has Not Received Notice.
Section 6131.59 | Drainage Improvement - Public Watercourse.
Section 6131.60 | Personal Interest of County Commissioner.
Section 6131.61 | Oath of Witnesses.
Section 6131.63 | Written Agreement for Construction of Drainage Improvement.