Ohio Revised Code
Chapter 1563 | Mine Construction, Maintenance, Abandonment
Section 1563.34 | Operator Program for Improving Roof Control Systems.

Effective: June 14, 2000
Latest Legislation: House Bill 601 - 123rd General Assembly
Each operator shall adopt an adequate program for improving roof control systems. This program shall include a roof control plan, provision for the training of miners, a history of all unintentional roof falls, and systematic evaluation of the effectiveness of the roof control system in use. Each operator shall adopt a roof control plan suitable to the roof conditions and the mining system for all underground roadways, travelways including escapeways, and working places of each mine. Roof control plans shall be filed with the chief of the division of mineral resources management. The chief shall notify the operator in writing of the approval of a proposed roof control plan. If revisions are required for approval, the changes required shall be specified and the operator shall be afforded an opportunity to discuss the revisions with the chief.
A roof control plan shall include the following information:
(A) Name and address of the company;
(B) Name and address of the mine;
(C) Names and addresses of the responsible officials;
(D) Area of the mine covered by the roof control plan;
(E) A columnar section of the mine strata that shall:
(1) Show the name and thickness of the coalbed and any persistent partings;
(2) Identify by type and show the thickness of each stratum (rock layer) up to and including the main roof over and for ten feet under the coalbed;
(3) Show the maximum cover over the mining area covered included in the roof control plan.
(F) A description of the sequence of mining and installation of supports including temporary supports. The description shall include:
(1) Drawings on eight and one-half by eleven inch paper or on paper folded to this size, showing the location of all roof, face, and rib supports for each method of mining employed at the mines. The scale shall be specified and not less than five feet to the inch nor more than twenty feet to the inch. A legend explaining all the symbols used shall also be included on the drawings.
(2) A list of all roof support materials employed in the roof control system including, where applicable, the name of the manufacturer and its designation for the item. Prior approval shall be obtained before making any changes in the materials listed.
No person shall refuse or neglect to comply with this section.

Structure Ohio Revised Code

Ohio Revised Code

Title 15 | Conservation of Natural Resources

Chapter 1563 | Mine Construction, Maintenance, Abandonment

Section 1563.01 | Chapter Does Not Apply to Chapter 1514 Activities.

Section 1563.02 | Gaseous Mine Defined.

Section 1563.03 | Map of New Mine.

Section 1563.04 | Survey - Copies of Map and Survey - Certification.

Section 1563.05 | Failure to Make and File Map or Addition.

Section 1563.06 | Right of Entry.

Section 1563.07 | Examination or Survey of Mine by Adjoining Landowner - Notice.

Section 1563.08 | Surveying Party - Fees.

Section 1563.09 | Examination or Survey - Liability for Damage.

Section 1563.10 | Refusal to Permit Survey - Judgment.

Section 1563.11 | Mining Near Public Roads.

Section 1563.111 | Mining Near Oil or Gas Well.

Section 1563.12 | Construction Regulations to Be Observed in Opening Mine.

Section 1563.13 | Maintenance of Means of Egress From Mine.

Section 1563.14 | Two Openings Required - Exceptions.

Section 1563.15 | Additional Opening for Protection Against Inundation.

Section 1563.16 | Doors.

Section 1563.17 | Break-Throughs and Brattices.

Section 1563.18 | Separate Traveling Ways.

Section 1563.19 | Slopes and Mechanical Haulageways - Refuge Holes.

Section 1563.20 | Track in Mines - Minimum Clearance.

Section 1563.21 | Location of Boilers.

Section 1563.23 | Bathing Facilities, Clothing Change Rooms, and Sanitary Toilet Facilities to Be Provided.

Section 1563.24 | Mine Foreperson of Gaseous Mine - Powers and Duties.

Section 1563.25 | Accumulation of Combustible Materials Prohibited.

Section 1563.26 | Rock Dusting - Testing of Dust Samples.

Section 1563.27 | Examination of Working Place by Mine Foreman.

Section 1563.28 | Examination of Working Place by Fire Boss.

Section 1563.29 | Examination of Working Place by Miner.

Section 1563.30 | Unsafe Working Place.

Section 1563.31 | Work to Cease When Working Place Found Dangerous.

Section 1563.32 | Fencing of Dangerous Places - Danger Signs.

Section 1563.33 | Roof Control System and Plan.

Section 1563.34 | Operator Program for Improving Roof Control Systems.

Section 1563.35 | Criteria or Specifications Applied to Plans.

Section 1563.36 | Excessive Widths of Rooms and Entries or Faulty Pillar Recovery Methods.

Section 1563.37 | Operator to Supply Roof Support Materials - Roof Bolts - Testing of Danger Areas.

Section 1563.39 | Precautions When Working Place Approaches Completed or Abandoned Workings.

Section 1563.40 | Closing of Openings to Abandoned Mines - Closing Abandoned Vertical Shafts.

Section 1563.41 | Sealing Off Abandoned Workings.

Section 1563.42 | Filing of Map of Abandoned Mine.

Section 1563.43 | When Notice to Chief Required.

Section 1563.45 | Abandoned Mines Recorded.

Section 1563.46 | Injunction.

Section 1563.99 | Penalty.