Effective - 28 Aug 1979
444.850. Publication of intent — notification to local governments — comments and objections may be filed, procedure — conferences, findings — hearings — appeals. — 1. At the time of submission of an application for a surface coal mining and reclamation permit, or renewal or revision of an existing permit, the applicant shall submit a copy of his advertisement of the ownership, precise location, and boundaries of the land to be affected. At the time of submission such advertisement shall be placed by the applicant in a local newspaper of general circulation in the locality of the proposed surface mine at least once a week for four consecutive weeks. The director shall within ten days after the application is filed notify various local governmental bodies, planning agencies, sewage and water treatment authorities, and water companies in the locality in which the proposed surface mining will take place, notifying them of the operator's intention to surface mine a particularly described tract of land and indicating the application's permit number and where a copy of the proposed mining and reclamation plan may be inspected. These local bodies, agencies, authorities, or companies may submit written comments within sixty days after the application is filed on the mining applications with respect to the effect of the proposed operation on the environment which are within their area of responsibility. Such comments shall immediately be transmitted to the applicant by the director and shall be made available to the public at the same locations as are the mining applications.
2. Any person having an interest which is or may be adversely affected or the officer or head of any federal, state, or local governmental agency or authority shall have the right to file written objections to the proposed initial or revised or renewal application for a permit for surface coal mining and reclamation operation with the director within sixty days after the application is filed. Such objections shall immediately be transmitted to the applicant by the director and shall be made available to the public. The applicant or the objector may, within thirty days after filing of objections, request an informal conference with the director. The director shall hold an informal conference in the locality of the proposed mining, if requested, within thirty days of the receipt of such request. The date, time and location of such informal conference shall be advertised by the director in a newspaper of general circulation in the locality at least two weeks prior to the scheduled conference date. The director may arrange with the applicant, upon request by any party to the administrative proceeding, access to the proposed mining area for the purpose of gathering information relevant to the proceeding. An electronic or stenographic record shall be made of the conference proceeding, unless waived by all parties. Such record shall be maintained and shall be accessible to the parties until final release of the applicant's performance bond. In the event all parties requesting the informal conference stipulate agreement prior to the requested informal conference and withdraw their request, such informal conference need not be held.
3. If an informal conference has been held, the director shall make written findings granting, requiring modification of or denying the permit in whole or in part and stating the reasons therefor, within sixty days of said conference, and shall furnish the applicant and all parties to the proceedings a copy of said findings.
4. If there has been no informal conference, the director shall, within sixty days after the last publication of notice in subsection 1, make written findings granting, requiring modification of or denying the permit in whole or in part and stating the reasons therefor, and shall furnish the applicant a copy of said findings.
5. If the application is approved, the permit shall be issued. If the application is disapproved, specific reasons therefor must be set forth in the notification. Within thirty days after the applicant is notified of the final decision of the director on the permit application, the applicant or any person with an interest which is or may be adversely affected may request a hearing on the reasons for final determination. The commission shall hold a hearing within thirty days of such request and provide notification to all interested parties at the time that the applicant is so notified. Such hearing shall be of record and a contested case. The chairman may designate one commission member as hearing officer, or may appoint a member in good standing of the Missouri Bar as hearing officer to hold the hearing and make recommendations to the commission, but the commission shall make the final decision thereon, and any commission member participating in the decision shall review the record before making decision. Within thirty days after the hearing the commission shall issue and furnish the applicant, and all persons who participated in the hearing, with the written decision of the commission granting, requiring modification of or denying the permit in whole or in part and stating the reasons therefor.
6. Where a hearing is requested pursuant to subsection 5 the commission may, under such conditions as it may prescribe, grant such temporary relief as it deems appropriate pending final determination of the proceedings if:
(1) All parties to the proceedings have been notified and given an opportunity to be heard on a request for temporary relief;
(2) The person requesting such relief shows that there is a substantial likelihood that he will prevail on the merits of the final determination of the proceeding; and
(3) Such relief will not adversely affect the public health or safety or cause significant imminent environmental harm to land, air, or water resources.
7. For the purpose of such hearing, the commission or hearing officer may administer oaths, subpoena witnesses, or written or printed materials, compel attendance of the witnesses, or production of the materials, and take evidence including but not limited to site inspections of the land to be affected and other surface coal mining operations carried on by the applicant in the general vicinity of the proposed operation. A verbatim record of each public hearing shall be made, and a transcript made available on the motion of any party or by order of the commission.
8. Any applicant or any person with an interest which is or may be adversely affected who has participated in the administrative proceedings, and who is aggrieved by the decision of the commission or if the commission fails to act within the time limits specified, shall have the right to appeal in accordance with section 444.900.
--------
(L. 1979 H.B. 459)
(2004) Subsection 8 of section does not confer standing on basis of status as economic competitor of permit applicant. Continental Coal, Inc. v. Missouri Land Reclamation Commission, 150 S.W.3d 371 (Mo.App.W.D.).
Structure Missouri Revised Statutes
Title XXIX - Ownership and Conveyance of Property
Chapter 444 - Rights and Duties of Miners and Mine Owners
Section 444.020 - Failure to post statement of conditions, effect — rights of miners.
Section 444.030 - Tender of payment.
Section 444.040 - Notice to owner or lessee.
Section 444.050 - Ownership of ore.
Section 444.060 - Injunction or restraining order — how granted.
Section 444.070 - Mining extending to adjoining lands, how determined.
Section 444.080 - Order to be read.
Section 444.090 - Refusal to permit survey — penalty.
Section 444.100 - Provisions for mining coal in certain cities.
Section 444.110 - Notice of intention to mine — publication required.
Section 444.120 - Permit from mayor and council — petition to circuit court.
Section 444.130 - Court to authorize mining operations, when — period of time specified.
Section 444.140 - Form of bond required.
Section 444.150 - Written permission of owner required — violation — provisions for payment of fine.
Section 444.160 - Costs, paid by whom.
Section 444.180 - Certain sections apply only to coal mining companies.
Section 444.320 - Mining under public highways and railroads prohibited.
Section 444.330 - Penalty for violation of section 444.320.
Section 444.350 - Citation of law.
Section 444.352 - Definitions.
Section 444.355 - Director, powers.
Section 444.358 - Permit required, when.
Section 444.360 - Application for permit, contents.
Section 444.362 - Closure plan, purposes, contents, review of.
Section 444.365 - Inspection — maintenance plan, purposes, contents, review of.
Section 444.372 - Permits, final approval by director — denial of permit, procedures.
Section 444.377 - Hearings, procedures.
Section 444.380 - Rules, authority, promulgation, procedure.
Section 444.410 - Members, interstate mining commission — appointment — compensation.
Section 444.500 - Citation of law.
Section 444.510 - Definitions.
Section 444.530 - Powers of commission — rules, procedure.
Section 444.540 - Annual strip mining permit required, fee, renewal.
Section 444.550 - Application for permit, contents.
Section 444.560 - Reclamation plan required, contents.
Section 444.570 - Bond, amount — commission may waive.
Section 444.580 - Annual permit, how amended.
Section 444.590 - Successor operator, assumption of liability — first operator released, when.
Section 444.600 - Permit — investigation, decision, hearing, court review — appeals.
Section 444.610 - Reclamation and care requirements.
Section 444.620 - Time limits on reclamation practices.
Section 444.630 - Report, when required, contents.
Section 444.640 - Commission to investigate all reports — release from bond, when.
Section 444.650 - Application for release from bond — objection, effect of — appeal.
Section 444.660 - Additional time, granted when.
Section 444.670 - Commission may inspect and search — warrant, where obtained.
Section 444.680 - Injunction, when — violation, procedure — hearing.
Section 444.690 - Testimony at hearing, how recorded — available, when.
Section 444.700 - Judicial review, when — additional evidence authorized.
Section 444.710 - Injunction and forfeiture of bond, when — attorney general to act.
Section 444.720 - Rules and regulations, when effective — notice, hearing — variances authorized.
Section 444.730 - Mined land reclamation fund created — purpose.
Section 444.740 - Commission authorized to receive funds and services.
Section 444.750 - Recreational use of reclaimed lands encouraged.
Section 444.755 - Repeal of existing law not intended.
Section 444.760 - Short title.
Section 444.762 - Declaration of policy.
Section 444.765 - Definitions.
Section 444.766 - Exceptions to land reclamation act provisions.
Section 444.767 - Powers of commission — rules, procedure, review.
Section 444.770 - Permit required, when — release of certain bonds — complaints, requirements.
Section 444.771 - Limitation on permits near an accredited school.
Section 444.774 - Reclamation requirements and conditions.
Section 444.775 - Release of bond, conditions — petition, hearing — administrative review.
Section 444.777 - Entry upon lands and inspection by commission members — warrants to issue.
Section 444.778 - Bond — form — amount — duration — forfeiture — power of reclamation.
Section 444.786 - Operation without permit prohibited, penalty.
Section 444.788 - Civil action.
Section 444.789 - Administrative procedure — inapplicability to public meetings.
Section 444.805 - Definitions.
Section 444.810 - Powers of commission — abandoned mine reclamation fund created, purpose.
Section 444.825 - Reclamation plan contents — confidential items.
Section 444.870 - Penalties, administrative and criminal, procedure.
Section 444.875 - Release of all or part of performance bond, procedure — objections may be filed.
Section 444.885 - Cessation orders — suspension or revocation of permits — injunctive relief.
Section 444.900 - Judicial review.
Section 444.905 - Severability — rights retained — replacement of water — explosives regulations.
Section 444.915 - Abandoned mine reclamation fund — deposits and expenditures.
Section 444.920 - Abandoned mine reclamation fund, commission's duties and powers.
Section 444.935 - Public health hazards — actions to abate, procedure.
Section 444.955 - Revegetation of mined land, responsibility transfer, approval required.
Section 444.960 - Fund, coal mine land reclamation, established, purpose, duties.
Section 444.970 - Penalty — delinquency or failure to comply with assessment or reclamation plan.