393.1400. Deferral of depreciation to regulatory asset — definitions — return for qualifying electric plant recorded to plant-in-service on utility's books — regulatory asset balances — requirements — grid modernization projects — expiration date. — 1. For purposes of this section, the following terms shall mean:
(1) "Commission", the public service commission;
(2) "Electrical corporation", the same as defined in section 386.020, but shall not include an electrical corporation as described in subsection 2 of section 393.110;
(3) "Qualifying electric plant", all rate-base additions, except rate-base additions for new coal-fired generating units, new nuclear generating units, new natural gas units, or rate-base additions that increase revenues by allowing service to new customer premises;
(4) "Rate-base cutoff date", the date rate-base additions are accounted for in a general rate proceeding. In the absence of a commission order that specifies the rate-base cutoff date, such date as reflected in any jointly proposed procedural schedule submitted by the parties in the applicable general rate proceeding, or as otherwise agreed to by such parties, shall be used;
(5) "Weighted average cost of capital", the return on rate base used to determine the revenue requirement in the electrical corporation's most recently completed general rate proceeding; provided, that in the absence of a commission determination of the return on rate base within the three-year period prior to August 28, 2022, the weighted average cost of capital shall be determined using the electrical corporation's actual capital structure as of December 31, 2021, excluding short-term debt, the electrical corporation's actual cost of long-term debt and preferred stock as of December 31, 2021, and a cost of common equity of nine and one-half percent.
2. (1) Notwithstanding any other provision of this chapter to the contrary, electrical corporations shall defer to a regulatory asset eighty-five percent of all depreciation expense and return associated with all qualifying electric plant recorded to plant-in-service on the utility's books commencing on or after August 28, 2018, if the electrical corporation has made the election provided for by subsection 5 of this section by that date, or on the date such election is made if the election is made after August 28, 2018. In each general rate proceeding concluded after August 28, 2018, the balance of the regulatory asset as of the rate-base cutoff date shall, subject only to the cap provided for in section 393.1655 or section 393.1656, as applicable, be included in the electrical corporation's rate base without any offset, reduction, or adjustment based upon consideration of any other factor, other than as provided for in subdivision (2) of this subsection, with the regulatory asset balance arising from deferrals associated with qualifying electric plant placed in service after the rate-base cutoff date to be included in rate base in the next general rate proceeding. The expiration of this section shall not affect the continued inclusion in rate base and amortization of regulatory asset balances that arose under this section prior to such expiration.
(2) The regulatory asset balances arising under this section shall be adjusted to reflect any prudence disallowances ordered by the commission. The provisions of this section shall not be construed to affect existing law respecting the burdens of production and persuasion in general rate proceedings for rate-base additions.
(3) Parts of regulatory asset balances created under this section that are not yet being recovered through rates shall include carrying costs at the electrical corporation's weighted average cost of capital, plus applicable federal, state, and local income or excise taxes. Regulatory asset balances arising under this section and included in rate base shall be recovered in rates through a twenty-year amortization beginning on the date new rates reflecting such amortization take effect.
3. (1) Depreciation expense deferred under this section shall account for all qualifying electric plant placed into service less retirements of plant replaced by such qualifying electric plant.
(2) Return deferred under this section shall be determined using the weighted average cost of capital applied to the change in plant-related rate base caused by the qualifying electric plant, plus applicable federal, state, and local income or excise taxes. In determining the return deferred, the electrical corporation shall account for changes in all plant-related accumulated deferred income taxes and changes in accumulated depreciation, excluding retirements.
4. Beginning February 28, 2019, and by each February twenty-eighth thereafter while the electrical corporation is allowed to make the deferrals provided for by subsection 2 of this section, electrical corporations that defer depreciation expense and return authorized under this section shall submit to the commission a five-year capital investment plan setting forth the general categories of capital expenditures the electrical corporation will pursue in furtherance of replacing, modernizing, and securing its infrastructure. The plan shall also include a specific capital investment plan for the first year of the five-year plan consistent with the level of specificity used for annual capital budgeting purposes. For each project in the specific capital investment plan on which construction commences on or after January first of the year in which the plan is submitted, and where the cost of the project is estimated to exceed twenty million dollars, the electrical corporation shall identify all costs and benefits that can be quantitatively evaluated and shall further identify how those costs and benefits are quantified. For any cost or benefit with respect to such a project that the electrical corporation believes cannot be quantitatively evaluated, the electrical corporation shall state the reasons the cost or benefit cannot be quantitatively evaluated, and how the electrical corporation addresses such costs and benefits when reviewing and deciding to pursue such a project. No such project shall be based solely on costs and benefits that the electrical corporation believes cannot be quantitatively evaluated. Any quantification for such a project that does not produce quantified benefits exceeding the costs shall be accompanied by additional justification in support of the project. For each of the first five years that an electrical corporation is allowed to make the deferrals provided for by subsection 2 of this section, the purchase and installation of smart meters shall constitute no more than six percent of the electrical corporation's total capital expenditures during any given year under the corporation's specific capital investment plan. At least twenty-five percent of the cost of each year's capital investment plan shall be comprised of grid modernization projects, including but not limited to:
(1) Increased use of digital information and controls technology to improve reliability, security, and efficiency of the electric grid;
(2) Dynamic optimization of grid operations and resources, with full cybersecurity;
(3) Deployment and integration of distributed resources and generation, including renewable resources;
(4) Development and incorporation of demand response, demand-side resources, and energy-efficiency resources;
(5) Deployment of smart technologies (real-time, automated, interactive technologies that optimize the physical operation of appliances and consumer devices) for metering, communications, concerning grid operations and status, and distribution automation;
(6) Integration of smart appliances and devices;
(7) Deployment and integration of advanced electricity storage and peak-shaving technologies, including plug-in electric and hybrid electric vehicles, and thermal storage air conditioning;
(8) Provision of timely information and control options to consumer;
(9) Development of standards for communication and interoperability of appliances and equipment connected to the electric grid, including the infrastructure serving the grid; and
(10) Identification and lowering of unreasonable or unnecessary barriers to adoption of smart grid technologies, practices, and services.
­­Project specific information need not be included for the five-year period covered by the plan. Within thirty days of the filing of any capital investment plan or annual update to an existing plan, the electrical corporation shall host a public stakeholder meeting to answer questions and receive feedback about the plan. After feedback is received, the electrical corporation shall file a notice with the commission of any modifications to the capital investment plan it has accepted. Changes to the plan, its implementation, or the level of investments made shall not constitute evidence of imprudence of the investments made under such plan. The submission of a capital investment plan under this section shall not affect in any way the commission's authority with respect to the grant or denial of a certificate of convenience and necessity under section 393.170. By February twenty-eighth following each year in which the electrical corporation submits a capital investment plan, the electrical corporation shall submit a report to the commission detailing actual capital investments made the previous year, the quantitatively evaluated benefits and costs generated by each of those investments that exceeded twenty million dollars, and any efficiencies achieved as a result of those investments.
5. This section shall only apply to any electrical corporation that has filed a notice with the commission of the electrical corporation's election to make the deferrals for which this section provides. An electrical corporation may provide notice to the commission one time under this subsection if such corporation has applied to the commission under subsection 2 of section 386.266, provided the corporation shall not concurrently utilize deferrals under this subsection and the electric rate adjustments set forth in subsection 3 of section 386.266. An electrical corporation's election shall allow it to make the deferrals provided for by subsection 2 of this section until December 31, 2028. Notwithstanding the immediately preceding sentence, an electrical corporation may seek permission to continue to make the deferrals provided for by subsection 2 of this section for an additional five years beyond December 31, 2028, by filing an application with the commission seeking such permission by December 31, 2026, which application shall be ruled upon by the commission within one hundred eighty days after its filing. In deciding whether to grant such permission to continue the commission shall have the authority, consistent with its statutory authority outside this section, to consider such factors as in its judgment it deems necessary and may condition the permission on factors that are relevant to the deferrals authorized by subsection 2 of this section. The commission shall make the determination of whether to grant such permission to continue after a hearing. An electrical corporation making deferrals provided for by subsection 2 of this section on and after January 1, 2024, shall be subject to the revenue requirement impact cap set forth under section 393.1656. Failure to obtain such commission permission to continue shall not affect deferrals made through the date for which permission has been granted, or the regulatory and ratemaking treatment of the regulatory assets arising from such deferrals as provided for by this section.
6. The commission may take into account any change in business risk to the corporation resulting from implementation of the deferrals in setting the corporation's allowed return in any rate proceeding, in addition to any other changes in business risk experienced by the corporation.
7. This section shall expire on December 31, 2033, except that the amortization of the regulatory asset balances arising under this section shall continue to be reflected in the electrical corporation's rates and remaining regulatory asset balances shall be included in the electrical corporation's rate base consistent with the ratemaking treatment and amortization previously approved by the commission pursuant to this section.
­­--------
(L. 2018 S.B. 564, A.L. 2022 S.B. 745)
Expires 12-31-33
CROSS REFERENCE:
Nonseverability clause, 393.1675

Structure Missouri Revised Statutes

Missouri Revised Statutes

Title XXV - Incorporation and Regulation of Certain Utilities and Carriers

Chapter 393 - Gas, Electric, Water, Heating and Sewer Companies

Section 393.010 - Corporations supplying gas, electricity or water — powers.

Section 393.015 - Sewer company may contract with water company to terminate water services for nonpayment of sewer bill — procedure — immunity — costs, reimbursement.

Section 393.016 - Termination of water service for nonpayment of sewer bill, when — immunity from civil liability — procedure to establish agreement, contents of agreement — exceptions.

Section 393.020 - Authorizing laying of underground water mains — power of eminent domain.

Section 393.025 - Sewer corporation may exercise eminent domain, how — sewer lines along or across public roads, how built and maintained — consent of municipality required, when.

Section 393.030 - Right to take water from nonnavigable stream and erect dam — purposes for which company may condemn land.

Section 393.040 - Filing of petition, issuance of summons, and notice of hearing — notice by publication, when.

Section 393.050 - Court shall appoint three commissioners to assess damages — payment of damages.

Section 393.060 - Number of owners may be joined in one petition.

Section 393.070 - Clerk of court shall give notice of petitions.

Section 393.080 - Cost of proceeding — how paid.

Section 393.090 - Corporation not authorized to enter or appropriate certain buildings.

Section 393.100 - Concerning the appropriation of property held by another corporation.

Section 393.105 - Rules against restraints on alienation and against perpetuities not to apply, when.

Section 393.106 - Definitions — electric power suppliers exclusive right to serve structures, exception — change of suppliers, procedure — purchase of auxillary power — permanent service supplied to nonrural area, when.

Section 393.108 - Hot weather rule, discontinuance of service prohibited, when.

Section 393.110 - Application of sections 393.110 to 393.285 — public service commission not to have jurisdiction over certain electrical corporations.

Section 393.120 - Definition of terms.

Section 393.130 - Safe and adequate service — charges — certain home rule cities, interest accrual, when.

Section 393.135 - Charges based on nonoperational property of electrical corporation prohibited.

Section 393.136 - Retroactive operation prohibited.

Section 393.137 - Electrical corporation rate adjustment, one time — definitions — when, how calculated — alternative deferral, when, how calculated.

Section 393.140 - General powers of commission in respect to gas, water, electricity and sewer services.

Section 393.145 - Certain utility may be placed under control of receiver — commission determination, procedure — appointment of receiver, bond.

Section 393.146 - Acquisition of small water or sewer corporation by capable public utility, when — definitions — alternatives to be discussed, factors to consider — price for acquisition, how determined — plan for improvements required — rate case p...

Section 393.147 - Loan programs, certain sewer and water corporations — authorized when, how.

Section 393.150 - Commission may fix rates after hearing — stay increase — burden of proof.

Section 393.152 - Delinquency in payment, deposit or guarantee to continue service prohibited, when — inapplicability.

Section 393.155 - Electric corporation's rates, increase in, phase-in of, when, how — powers of commission.

Section 393.160 - Inspection of gas, water and electric meters.

Section 393.170 - Approval of incorporation and franchises — certificate.

Section 393.175 - Designation as sole regional or watershed supplier, application — preferences — pricing of services.

Section 393.180 - Right to issue stocks, bonds, notes subject to regulation.

Section 393.190 - Transfer of franchise or property to be approved, procedure — impact of transfer on local tax revenues, information on to be furnished, to whom, procedure.

Section 393.200 - Approval of issues of stocks, bonds and other forms of indebtedness.

Section 393.210 - Certificate of commission to be recorded — stock dividend prohibited.

Section 393.220 - Account for disposition of proceeds — issue void, when, exception — penalties — state not liable.

Section 393.230 - Power of commission to ascertain valuation of property of gas, electrical, water and sewer corporations.

Section 393.240 - Power of commission to require depreciation account of gas, electrical, water and sewer corporations.

Section 393.250 - Reorganizations of gas, electrical, water and sewer corporations.

Section 393.260 - Complaints as to quality and price of gas, water, electricity and sewer service — investigation by commission — form of complaints.

Section 393.270 - Notice and hearing — order fixing price of gas, water, electricity or sewer service, or requiring improvement.

Section 393.275 - Commission to notify cities and counties of tariff increases, when, contents of notice — reduction of license tax, when — exception, procedure — to maintain.

Section 393.280 - Defense in case of excessive charges for gas, water, electricity or sewer service.

Section 393.290 - Powers of commission relating to other utilities made applicable to heating companies.

Section 393.291 - Steam heating companies, may file under small company rate procedures, when.

Section 393.292 - Nuclear power plant decommissioning, expense of, rate increase allowed, when, how.

Section 393.297 - Purpose of sections 393.298 to 393.302.

Section 393.298 - Definitions.

Section 393.299 - Provision of energy services, limitations, exceptions — agreements with commission to pay business license taxes — nonseverability clause.

Section 393.300 - Customer bills in Braille or bold-faced type on request.

Section 393.301 - Challenging the validity of an agreement, notification — invalidity of section 393.299, effect.

Section 393.302 - Tax on energy consumption, ordinance imposing tax, ballot measure required.

Section 393.310 - Certain gas corporations to file set of experimental tariffs with PSC, minimum requirements — extension of tariffs.

Section 393.320 - Acquisition of small water utilities, establishment of ratemaking rate base, procedure.

Section 393.355 - Special rate for electrical corporations authorized, when — net margin tracking mechanism — lower rate for facility, when, duration.

Section 393.356 - No modification or elimination of special rate under section 393.355.

Section 393.358 - Planned infrastructure projects, qualification process for contractors — definitions — requirements — report to general assembly.

Section 393.400 - Regulatory asset or liability accounts — corporations to defer portion of local property taxes to account, how calculated — rate base adjustment, when.

Section 393.410 - Definitions.

Section 393.420 - Acquisition of right to use storage reservoir under publicly owned lands.

Section 393.430 - Gas storage company may exercise eminent domain — purposes — procedure.

Section 393.440 - Powers not to be exercised until approved by public service commission.

Section 393.450 - Buildings not to be condemned.

Section 393.460 - Strata and formations not subject to condemnation.

Section 393.470 - Limitation on condemnation of property held for public uses.

Section 393.480 - Law not to restrict other powers of eminent domain.

Section 393.490 - Rights of owner of land in condemned strata.

Section 393.500 - Gas in underground storage personal property.

Section 393.510 - Limitations to begin, when — cause deemed to accrue, when.

Section 393.550 - Definitions.

Section 393.553 - Written demand, notice, contents, refusal of access deemed denial of access, when.

Section 393.555 - Denial of access, filing of affidavit, contents — initial access order, procedure, becomes final order of access, when.

Section 393.557 - Final order of access, exception — bond, amount — hearing.

Section 393.559 - Access, with sheriff, expenses of sheriff.

Section 393.561 - Damages awarded to utility customer, when — costs, court to determine who pays.

Section 393.563 - Other rights of access, not affected.

Section 393.565 - Appeals, customer must give bond.

Section 393.700 - Short title.

Section 393.705 - Definitions.

Section 393.710 - Municipalities, public water supply districts and sewer districts may form commission — purposes — contents of contract — board of directors.

Section 393.715 - Powers of commission — purchase of private water utility serving outside municipal limits, effect — successorship, continued and new service authorized, when.

Section 393.720 - Commissions to be bodies public and corporate.

Section 393.725 - Bonds issued to be revenue bonds only — form of bonds.

Section 393.730 - Requirements of resolution authorizing bonds.

Section 393.735 - Additional security for bonds issued may be given, how.

Section 393.740 - Certain taxes applicable.

Section 393.745 - Refunding bonds may be issued.

Section 393.750 - Bonds legal investments for enumerated purposes.

Section 393.755 - Bonds may be repurchased.

Section 393.760 - Election on issuance of bonds — required actions — notice — conduct of election — form of ballot — alternative voting procedures.

Section 393.770 - Purchase agreements authorized — terms — not to constitute debt.

Section 393.825 - Nonprofit sewer companies, who may organize — articles of incorporation, contents, submission to secretary of state.

Section 393.827 - Conversion of wastewater disposal or treatment corporation to nonprofit sewer company, requirements for conversion — term "articles of incorporation" includes articles of conversion.

Section 393.829 - Powers.

Section 393.831 - Articles of incorporation, amendment requirements.

Section 393.833 - Principal office, change of, procedure.

Section 393.835 - Articles of incorporation, amendment, consolidation, merger, conversion or dissolution — filing — duties of secretary of state.

Section 393.837 - Securities law of Missouri not to apply, when.

Section 393.839 - Membership — meetings, annual, special — quorum — voting.

Section 393.841 - Voting districts may be provided, when, procedure.

Section 393.843 - Board of directors, powers and duties.

Section 393.845 - Officers, annual election, removal from office — employees and agents.

Section 393.847 - Department of natural resources, jurisdiction, supervision, powers and duties — public service commission jurisdiction, limitations.

Section 393.849 - Excess revenues.

Section 393.851 - Prepayment of debt not prohibited.

Section 393.853 - Voluntary dissolution, articles, contents, submission to secretary of state.

Section 393.855 - Voluntary dissolution, procedure for winding up affairs.

Section 393.857 - Construction of laws relating to nonprofit sewer companies.

Section 393.861 - Private property of members exempt from execution for debts of company.

Section 393.900 - Nonprofit water companies may be organized — articles of incorporation.

Section 393.903 - Corporations may convert to nonprofit water companies, how.

Section 393.906 - Powers and duties.

Section 393.909 - May amend articles of incorporation, how.

Section 393.912 - Change of principal office, how.

Section 393.915 - Certain articles to be filed with secretary of state and shall take effect upon being filed by secretary of state.

Section 393.918 - Securities law not to apply, when.

Section 393.921 - Members must use services of nonprofit water company if available — membership not transferable, exception — meetings, how called, notice, procedure.

Section 393.924 - Company territory may be divided into voting districts.

Section 393.927 - Board of directors, powers, duties, number, terms of office, procedure.

Section 393.930 - Officers, qualifications, powers and duties, terms of office.

Section 393.933 - Compliance with department of natural resources and other laws — public service commission not to have jurisdiction.

Section 393.936 - Revenues to be distributed, when.

Section 393.939 - Prepayment of indebtedness permitted.

Section 393.942 - Voluntary dissolution before commencing operations.

Section 393.945 - Voluntary dissolution and windup of affairs after commencing operations.

Section 393.948 - Nonprofit water company law construed liberally, may elect to follow certain corporate laws in articles of incorporation.

Section 393.951 - Private property of members exempt from execution — members not liable for debts of company.

Section 393.954 - Claims against insured nonprofit water company after dissolution, procedure.

Section 393.1000 - Definitions.

Section 393.1003 - Rate schedules, procedures to establish or change (St. Louis County).

Section 393.1006 - Documentation to be submitted — notice to be published — examination of proposal — authorization of commission, when — pretax revenues, factors to be considered — revised rate schedule, filed when — rulemaking authority.

Section 393.1009 - Definitions.

Section 393.1012 - Rate schedules, procedures to establish or change — prequalification process, requirements — report to general assembly.

Section 393.1015 - Documentation to be submitted — notice to be published — examination of proposal — authorization by commission, when — pretax revenues, factors to be considered — revised rate schedule, filed when — rulemaking authority — expiratio...

Section 393.1020 - Citation of law.

Section 393.1025 - Definitions.

Section 393.1030 - Electric utilities, portfolio requirements — tracking requirements — rebate offers — certification of electricity generated — rulemaking authority.

Section 393.1040 - Encouragement of reduced consumption, objective of act.

Section 393.1045 - Cap on increase in retail charges based on renewable mandates.

Section 393.1050 - Electrical corporations achieving certain level of renewable energy technology nameplate capacity exempt from certain fees and rebates.

Section 393.1072 - Task force established — members, duties — report, contents — meetings — expiration.

Section 393.1075 - Citation of law — definitions — policy to value demand-side investments equal to traditional investments — development of cost recovery mechanisms — costs not to be assigned to customers, when — rulemaking authority — annual report...

Section 393.1150 - Suit or claim brought, measure of damages.

Section 393.1400 - Deferral of depreciation to regulatory asset — definitions — return for qualifying electric plant recorded to plant-in-service on utility's books — regulatory asset balances — requirements — grid modernization projects — expiration...

Section 393.1500 - Citation of law.

Section 393.1503 - Definitions.

Section 393.1506 - Establishment of or change to WSIRA for recovery of appropriate pretax revenues, when, procedure.

Section 393.1509 - Filing of WSIRA petition, procedure — pretax revenues, considerations — calculation of WSIRA — revised schedule, when — commission authority — expiration date.

Section 393.1610 - Small scale and private innovative technology investments — definitions.

Section 393.1620 - Average and excess method, allocation of costs — limitation on commission consideration for general rates — expiration date.

Section 393.1640 - Growth project, discounts, when — requirements — discounts expire, when.

Section 393.1650 - Construction-related services, contractor qualification process — definitions — requirements — report.

Section 393.1655 - Rate modifications, limitations on — definitions.

Section 393.1656 - Electric corporation base rates — regulatory asset balance inclusion, impact cap, effect on — excess amount not included in rate base — definitions.

Section 393.1665 - Utility-owned solar facilities in Missouri, investment in, when — expiration date.

Section 393.1670 - Solar rebates, amount — limitations — recovery of costs — rulemaking authority — definitions — expiration date.

Section 393.1675 - Nonseverability clause.

Section 393.1700 - Securitized utility tariff bonds, financing order for energy transition costs — definitions — petition, contents, procedure — order issued, contents — requirements — severability clause.

Section 393.1705 - Replacement resources investment — petition, approval, amount — base determination — deferrals — petition procedure.

Section 393.1715 - Retirement of generating facilities, ratemaking principles and treatment as applied to base rates, retirement date, useful life, and depreciation — procedure — monitoring — coal-fixed generating assets in rate base — rulemaking aut...