Subdivision 1. Contract conditions. The commissioner may contract to purchase by installment payments capital or other equipment or services intended to improve the energy efficiency or reduce the energy costs of a state building or facility if:
(1) the term of the contract does not exceed 15 years, with not more than a 15-year payback beginning at the completion of the project;
(2) the entire cost of the contract is a percentage of the resultant savings in energy costs and measurable operational costs. "Savings in energy cost" means a comparison of energy cost and energy usage under the precontract conditions, including reasonable projections of energy cost and usage if no change is made to the precontract conditions, against energy cost and usage with the changes made under the contract. If it is not cost effective to directly measure energy cost and/or energy usage, reasonable engineering estimates may be substituted for measured results. "Savings in measurable operational costs" may include savings from inventory reductions and outside maintenance expense, but do not include savings from in-house staff labor;
(3) the contract for purchase must be completed using a solicitation;
(4) the commissioner has determined that the contract vendor is a responsible vendor;
(5) the contract vendor can finance or obtain financing for the performance of the contract without state assistance or guarantee; and
(6) the state may unilaterally cancel the agreement if the legislature fails to appropriate funds to continue the contract or if the contractor at any time during the term of the contract fails to perform its contractual obligations, including failure to deliver or install equipment or materials, failure to replace faulty equipment or materials in a timely fashion, and failure to maintain the equipment as agreed in the contract.
Subd. 2. Energy appropriation. The commissioner may spend money appropriated for energy costs in payment of a contract under this section.
Subd. 3. Energy conservation incentives. Notwithstanding any other law to the contrary, fuel cost savings resulting from energy conservation actions shall be available at the managerial level at which the actions took place for expenditure for other purposes within the biennium in which the actions occur or in the case of a shared savings agreement for the contract period of the shared savings agreement. For purposes of this subdivision "shared savings agreement" means a contract meeting the terms and conditions of subdivision 1.
Subd. 4. Energy and operational costs. (a) The entire cost of an energy efficiency installment purchase contract must be a percentage of the resultant savings in energy and operational costs. Neither the state nor any agency is liable to make payments on the contract except to the extent that there are savings in energy and operational costs that must be shared with other parties to the contract.
(b) The state and the contract vendor may agree to a reasonable floor price for each type of energy used in the savings calculations at the time of contract execution. If the state and the vendor agree to a floor price, that floor price shall be used throughout the term of the contract.
1998 c 386 art 1 s 15; 1999 c 250 art 1 s 66; 2002 c 260 s 1
Structure Minnesota Statutes
Chapters 16A - 16E — Administration And Finance
Chapter 16C — State Procurement
Section 16C.001 — Commissioner's Authority; Scope.
Section 16C.03 — Commissioner's Authority; Powers And Duties.
Section 16C.04 — Ethical Practices And Conflict Of Interest.
Section 16C.045 — Reporting Of Violations.
Section 16C.05 — Contract Management; Validity And Review.
Section 16C.051 — Contracts With Russia Or Belarus.
Section 16C.053 — Contracts With Vendors Who Discriminate Against Israel Prohibited.
Section 16C.054 — Accommodation For Hard-of-hearing In State-funded Capital Projects.
Section 16C.055 — Barter Arrangements Limited.
Section 16C.06 — Procurement Requirements.
Section 16C.071 — Exception For Federal Contracts.
Section 16C.072 — Contracts For Tax-related Activities.
Section 16C.0725 — Purchase Of Recycled, Repairable, And Durable Materials.
Section 16C.073 — Purchase And Use Of Paper Stock; Printing.
Section 16C.074 — Consideration Of Environmental Impacts Of Metal Recycling Facilities.
Section 16C.08 — Professional Or Technical Services.
Section 16C.086 — Call Center.
Section 16C.087 — Selection Of Certain Professional Service Contractors.
Section 16C.09 — Procedure For General Service Contracts.
Section 16C.10 — Exceptions Authorized.
Section 16C.105 — Cooperatives Authorized.
Section 16C.11 — Cooperative Purchasing Venture; Revolving Fund.
Section 16C.12 — Agricultural Food Products Grown In State.
Section 16C.13 — Certain Vehicles.
Section 16C.135 — Purchases Of Fuel And Vehicles By State Agencies.
Section 16C.137 — Minimizing Energy Use; Renewable Fuels.
Section 16C.138 — State Purchasing Of Electric And Plug-in Hybrid Electric Vehicles.
Section 16C.14 — Energy Efficiency Installment Purchases.
Section 16C.143 — Energy Forward Pricing Mechanisms.
Section 16C.144 — Guaranteed Energy-savings Program.
Section 16C.145 — Nonvisual Technology Access Standards.
Section 16C.147 — Document Imaging; Use Of Persons With Developmental Disabilities.
Section 16C.15 — Rehabilitation Facilities And Extended Employment Providers.
Section 16C.151 — Purchases From Corrections Industries.
Section 16C.155 — Janitorial Contracts; Rehabilitation Programs And Extended Employment Providers.
Section 16C.16 — Designation Of Procurements From Small Businesses.
Section 16C.17 — Encouragement Of Participation.
Section 16C.19 — Eligibility; Rules.
Section 16C.20 — Certification.
Section 16C.21 — Criminal Penalty.
Section 16C.25 — Building And Construction Contracts.
Section 16C.251 — Best And Final Offer.
Section 16C.26 — Competitive Bids Or Proposals.
Section 16C.28 — Contracts; Award.
Section 16C.281 — Original Jurisdiction Of Public Procurement Actions.
Section 16C.285 — Responsible Contractor Requirement Defined.
Section 16C.29 — Contract Management And Review.
Section 16C.32 — Design-build Contracts, Definitions.
Section 16C.33 — Design-build.
Section 16C.34 — Construction Manager At Risk.
Section 16C.35 — Job Order Contracting.
Section 16C.36 — Reorganization Services Under Master Contract.