Subdivision 1. Required procedure. The procedure in this section must be followed if:
(1) a project is to be constructed within the watershed district under an agreement between the managers and the state or federal government and the cost of the project is to be paid for in whole or in part by the state or federal government, but the rights-of-way and the cost of the project are assumed by the watershed district; or
(2) the managers are undertaking all or a portion of the basic water management project as identified in the watershed management plan.
Subd. 2. Board and director reports. A copy of the project plan must be transmitted to the board and the director. The board and the director must review the project plan and prepare reports on the project. The reports must be transmitted to the managers.
Subd. 3. Project hearing notice. (a) After receiving the board's and the director's reports, the managers must set a time and location for a hearing on the proposed project.
(b) The project hearing notice must state:
(1) the time and location of the project hearing;
(2) the general nature of the proposed project;
(3) the estimated cost of the proposed project; and
(4) the method by which the cost of the proposed project is to be paid, including the cost to be allocated to each affected municipality or the state government.
(c) The managers must give notice by publication before the date of the hearing in a legal newspaper, published in the counties where property is to be improved by the proposed project. The last publication must occur between 30 days and ten days before the project hearing.
(d) At least ten days before the project hearing, notice by mail must be given to the director and the municipalities entirely or partly within the project area.
(e) Failure to give mailed notice or defects in the notice do not invalidate the proceedings.
Subd. 4. Project hearing. At the project hearing, the managers must hear all parties interested in the proposed project.
Subd. 5. Establishment order. After the project hearing, if the managers find that the project will be conducive to public health, promote the general welfare, and is in compliance with the watershed management plan and the provisions of this chapter, the board must, by order, establish the project. The establishment order must include the findings of the managers.
1990 c 391 art 4 s 45
Structure Minnesota Statutes
Chapter 103D — Watershed Districts
Section 103D.011 — Definitions.
Section 103D.501 — Construction And Administration.
Section 103D.505 — Reference To Other Drainage Laws.
Section 103D.511 — Certain Condemnation Provisions; Applicability.
Section 103D.515 — Preexisting And Improved Water Rights.
Section 103D.521 — Rights Assured Due Process Of Law.
Section 103D.525 — Proceedings After Faulty Notices.
Section 103D.531 — Continuance Of Hearings.
Section 103D.535 — Appellate Procedures And Review.
Section 103D.537 — Appeals Of Rules, Permit Decisions, And Orders.
Section 103D.539 — Informal Resolution Of Disputes.
Section 103D.541 — Appeal Of Court Order.
Section 103D.545 — Enforcement.
Section 103D.551 — Enforcing Rules And Orders.
Section 103D.101 — Board Of Water And Soil Resources.
Section 103D.105 — Board Hearings.
Section 103D.111 — Appeal Of Board Orders.
Section 103D.201 — Watershed District Purposes.
Section 103D.205 — Establishment Petition.
Section 103D.211 — Auditor's Certification Of Petitioners.
Section 103D.215 — Director's Report.
Section 103D.221 — Establishment Hearing; Notice.
Section 103D.225 — Hearing And Order To Establish.
Section 103D.231 — Dismissing Establishment Proceedings.
Section 103D.251 — Watershed District Boundary Changes.
Section 103D.255 — Withdrawing Territory.
Section 103D.261 — Proceedings To Enlarge Watershed District.
Section 103D.265 — Consolidating Districts.
Section 103D.271 — Procedure For Terminating Watershed District.
Section 103D.301 — Distribution Of Manager Positions.
Section 103D.305 — Increasing Number Of Managers.
Section 103D.311 — Appointing Managers.
Section 103D.321 — Principal Place Of Business.
Section 103D.331 — Advisory Committee.
Section 103D.335 — District And Managers' Powers.
Section 103D.337 — Technical Advisory Committees.
Section 103D.351 — Annual Report.
Section 103D.355 — Annual Audit.
Section 103D.401 — Watershed Management Plan.
Section 103D.405 — Revised Watershed Management Plan.
Section 103D.411 — Amendment Of Watershed Management Plan And Revised Watershed Management Plan.
Section 103D.601 — Project Initiated By Managers.
Section 103D.605 — Project Constructed With Government Aid Or As Part Of Plan.
Section 103D.611 — Construction By Government Agencies.
Section 103D.615 — Emergency Projects.
Section 103D.621 — Drainage Improvements.
Section 103D.625 — Drainage Systems In Watershed District.
Section 103D.631 — Maintaining Projects.
Section 103D.635 — Repairs And Improvements Exceeding Normal Maintenance.
Section 103D.641 — Work Without Bid.
Section 103D.701 — Project Initiation.
Section 103D.705 — Project Petition.
Section 103D.711 — Engineer's Report.
Section 103D.715 — Appraisers; Determining Benefits And Damages.
Section 103D.721 — Managers; Determining Benefits And Damages.
Section 103D.725 — Benefited Property; Determination.
Section 103D.729 — Water Management District.
Section 103D.730 — Stormwater Facilities.
Section 103D.731 — Appraisers' Report; Examination.
Section 103D.735 — Hearing On Petition And Reports.
Section 103D.741 — Final Hearing Notice.
Section 103D.745 — Final Hearing.
Section 103D.801 — Procedure When Contract Is Not Let.
Section 103D.805 — Filing Managers' Order Establishing Project.
Section 103D.811 — Bids For Construction.
Section 103D.815 — Controlling Contracts.
Section 103D.821 — Bridge Or Grade Removal; Passage Of Equipment.
Section 103D.901 — Assessments; Levies.
Section 103D.905 — Funds Of Watershed District.
Section 103D.921 — District Court To Create Preliminary Fund.