Section 476.53 - Electric generating and transmission facilities.

476.53 Electric generating and transmission facilities.
1. It is the intent of the general assembly to attract the development of electric power generating and transmission facilities within the state in sufficient quantity to ensure reliable electric service to Iowa consumers and provide economic benefits to the state. It is also the intent of the general assembly to encourage rate-regulated public utilities to consider altering existing electric generating facilities, where reasonable, to manage carbon emission intensity in order to facilitate the transition to a carbon-constrained environment.
2. a. The general assembly’s intent with regard to the development of electric power generating and transmission facilities, or the significant alteration of an existing generating facility, as provided in subsection 1, shall be implemented in a manner that is cost-effective and compatible with the environmental policies of the state, as expressed in this Title XI.
b. The general assembly’s intent with regard to the reliability of electric service to Iowa consumers, as provided in subsection 1, shall be implemented by considering the diversity of the types of fuel used to generate electricity, the availability and reliability of fuel supplies, and the impact of the volatility of fuel costs.
3. a. The board shall specify in advance, by order issued after a contested case proceeding, the ratemaking principles that will apply when the costs of the electric power generating facility or alternate energy production facility are included in regulated electric rates whenever a rate-regulated public utility does any of the following:
(1) (a) Files an application pursuant to section 476A.3 to construct in Iowa a baseload electric power generating facility with a nameplate generating capacity equal to or greater than three hundred megawatts or a combined-cycle electric power generating facility, or an alternate energy production facility as defined in section 476.42, or to significantly alter an existing generating facility. For purposes of this subparagraph, a significant alteration of an existing generating facility must, in order to qualify for establishment of ratemaking principles, fall into one of the following categories:
(i) Conversion of a coal fueled facility into a gas fueled facility.
(ii) Addition of carbon capture and storage facilities at a coal fueled facility.
(iii) Addition of gas fueled capability to a coal fueled facility, in order to convert the facility to one that will rely primarily on gas for future generation.
(iv) Addition of a biomass fueled capability to a coal fueled facility.
(v) Repowering of an alternate energy production facility. For purposes of this subparagraph subdivision, “repowering” shall mean either the complete dismantling and replacement of generation equipment at an existing project site, or the installation of new parts and equipment to an existing alternate energy production facility in order to increase energy production, reduce load, increase service capacity, improve project reliability, or extend the useful life of the facility.
(b) With respect to a significant alteration of an existing generating facility, an original facility shall not be required to be either a baseload or a combined-cycle facility. Only the incremental investment undertaken by a utility under subparagraph division (a), subparagraph subdivision (i), (ii), (iii), or (iv) shall be eligible to apply the ratemaking principles established by the order issued pursuant to paragraph “e”. Facilities for which advanced ratemaking principles are obtained pursuant to this section shall not be subject to a subsequent board review pursuant to section 476.6, subsection 19, to the extent that the investment has been considered by the board under this section. To the extent an eligible utility has been authorized to make capital investments subject to section 476.6, subsection 19, such investments shall not be eligible for ratemaking principles pursuant to this section.
(2) Leases or owns in Iowa, in whole or in part, a new baseload electric power generating facility with a nameplate generating capacity equal to or greater than three hundred megawatts or a combined-cycle electric power generating facility, or a new alternate energy production facility as defined in section 476.42.
b. In determining the applicable ratemaking principles, the board shall not be limited to traditional ratemaking principles or traditional cost recovery mechanisms. Among the principles and mechanisms the board may consider, the board has the authority to approve ratemaking principles proposed by a rate-regulated public utility that provide for reasonable restrictions upon the ability of the public utility to seek a general increase in electric rates under section 476.6 for at least three years after the generating facility begins providing service to Iowa customers.
c. In determining the applicable ratemaking principles, the board shall make the following findings:
(1) The rate-regulated public utility has in effect a board-approved energy efficiency plan as required under section 476.6, subsection 15.
(2) The rate-regulated public utility has demonstrated to the board that the public utility has considered other sources for long-term electric supply and that the facility or lease is reasonable when compared to other feasible alternative sources of supply.
d. The applicable ratemaking principles shall be determined in a contested case proceeding, which proceeding may be combined with the proceeding for issuance of a certificate conducted pursuant to chapter 476A.
e. The order setting forth the applicable ratemaking principles shall be issued prior to the commencement of construction or lease of the facility.
f. Following issuance of the order, the rate-regulated public utility shall have the option of proceeding according to either of the following:
(1) Withdrawing its application for a certificate pursuant to chapter 476A.
(2) Proceeding with the construction or lease of the facility.
g. Notwithstanding any provision of this chapter to the contrary, the ratemaking principles established by the order issued pursuant to paragraph “e” shall be binding with regard to the specific electric power generating facility in any subsequent rate proceeding.
4. The utilities board and the consumer advocate may employ additional temporary staff, or may contract for professional services with persons who are not state employees, as the board and the consumer advocate deem necessary to perform required functions as provided in this section, including but not limited to review of power purchase contracts, review of emission plans and budgets, and review of ratemaking principles proposed for construction or lease of a new generating facility. Beginning July 1, 2002, there is appropriated out of any funds in the state treasury not otherwise appropriated, such sums as may be necessary to enable the board and the consumer advocate to hire additional staff and contract for services under this section. The costs of the additional staff and services shall be assessed to the utilities pursuant to the procedure in section 476.10 and section 475A.6.
83 Acts, ch 127, §36, 50
; 2001 Acts, 1st Ex, ch 4, §12, 36
; 2002 Acts, 2nd Ex, ch 1003, §31, 35
; 2003 Acts, ch 29, §5, 6; 2003 Acts, ch 159, §2 – 4; 2004 Acts, ch 1101, §67; 2010 Acts, ch 1176, §2, 3; 2010 Acts, ch 1193, §55, 69, 80; 2013 Acts, ch 30, §113; 2015 Acts, ch 29, §61; 2015 Acts, ch 138, §46, 161, 162; 2018 Acts, ch 1135, §18; 2018 Acts, ch 1160, §15
Referred to in §476.23, 476A.4, 476A.6, 476A.7

Structure Iowa Code

Iowa Code

Title XI - NATURAL RESOURCES

Chapter 476 - PUBLIC UTILITY REGULATION

Section 476.1 - Applicability of authority.

Section 476.1A - Applicability of authority — certain electric utilities.

Section 476.1B - Applicability of authority — municipally owned utilities.

Section 476.1C - Applicability of authority — certain gas utilities.

Section 476.1D - Regulation and deregulation of communications services.

Section 476.2 - Board powers and rules — utility’s Iowa office.

Section 476.3 - Complaints — investigation — refunds.

Section 476.4 - Tariffs filed.

Section 476.4A - Exemption from tariff filings for telephone utilities.

Section 476.5 - Adherence to schedules.

Section 476.6 - Changes in rates, charges, schedules, and regulations — supply and cost review — water costs for fire protection — energy efficiency.

Section 476.6A - Alternate energy production facilities — notification requirements.

Section 476.7 - Application by utility for review.

Section 476.8 - Utility charges and service.

Section 476.9 - Accounts rendered to board.

Section 476.10 - Investigations — expense — appropriation.

Section 476.10A - Funding for Iowa energy center and center for global and regional environmental research.

Section 476.10B - Energy-efficient building.

Section 476.11 - Telephone toll connections.

Section 476.12 - Rehearings before board.

Section 476.13 - Judicial review.

Section 476.14 - Violations stopped.

Section 476.15 - Extent of jurisdiction.

Section 476.16 - Annual report.

Section 476.17 - Peak-load energy conservation.

Section 476.18 - Impermissible charges.

Section 476.19 - Construction of statutes.

Section 476.20 - Disconnection limited — notice — moratorium — deposits.

Section 476.21 - Discrimination prohibited.

Section 476.22 - Definition.

Section 476.23 - Electric service conflicts — certificates of authority.

Section 476.24 - Electric utility service area maps.

Section 476.25 - Assigned service areas — electric utilities — legislative policy.

Section 476.26 - Effect of incorporation, annexation, or consolidation.

Section 476.27 - Public utility crossing — railroad rights-of-way.

Section 476.29 - Certificates for providing local telecommunications services.

Section 476.31 - Continuing audit of operation.

Section 476.32 - Review of annual reports.

Section 476.33 - Rules governing hearings.

Section 476.41 - Purpose.

Section 476.42 - Definitions.

Section 476.43 - Rates for alternate energy production facilities.

Section 476.44 - Exceptions.

Section 476.44A - Trading of credits.

Section 476.45 - Exemption from excess capacity.

Section 476.46 - Alternate energy revolving loan program.

Section 476.46A - Energy infrastructure revolving loan program.

Section 476.47 - Alternate energy purchase programs.

Section 476.48 - Small wind innovation zone program.

Section 476.49 - Billing methods for distributed generation customers.

Section 476.51 - Civil penalty.

Section 476.52 - Management efficiency.

Section 476.53 - Electric generating and transmission facilities.

Section 476.53A - Renewable electric power generation.

Section 476.54 - Delayed payment charges.

Section 476.55 - Complaint of antitrust activities.

Section 476.56 - Energy costs provided.

Section 476.57 - Limitations on use of ADAD equipment — penalty.

Section 476.58 - Safety of distributed generation facilities — disconnection device required — rules.

Section 476.62 - Energy-efficient lighting required.

Section 476.63 - Energy efficiency programs.

Section 476.65 - Energy audits.

Section 476.66 - Customer contribution fund.

Section 476.71 - Purpose.

Section 476.72 - Definitions.

Section 476.73 - Affiliate records.

Section 476.74 - Affiliate information required to be filed.

Section 476.75 - Audits required.

Section 476.76 - Reorganization defined.

Section 476.77 - Time and standards for review.

Section 476.78 - Cross-subsidization prohibited.

Section 476.79 - Provision of nonutility service.

Section 476.80 - Additional requirements.

Section 476.81 - Audit required.

Section 476.82 - Exemption — energy efficiency.

Section 476.83 - Complaints.

Section 476.84 - Water, sanitary sewer, and storm water utilities — acquisitions — advance ratemaking.

Section 476.86 - Definitions.

Section 476.87 - Certification of competitive natural gas providers.

Section 476.91 - Alternative operator services.

Section 476.95 - Internet protocol-enabled service and voice over internet protocol service — regulation.

Section 476.95A - Annual registration for telecommunications service providers.

Section 476.95B - Applicability of authority.

Section 476.96 - Definitions.

Section 476.97 - Price regulation.

Section 476.98 - Earnings calculation and report.

Section 476.99 - Additional price regulation plan provisions.

Section 476.100 - Prohibited acts.

Section 476.101 - Local exchange competition.

Section 476.102 - Universal service.

Section 476.103 - Unauthorized change in service — civil penalty.

Section 476.104 - Severability.