Indiana Code
Chapter 9. State Highway Contracts; General Powers
8-23-9-26. Claims Against Contractors; Filing With Department

Sec. 26. A person, firm, limited liability company, or corporation to whom any money is owed for having performed labor or furnished material or other service in the construction of a highway or bridge in the state highway system or in the construction or repair of a building or other structure for the department, whether the work was performed for a contractor or subcontractor, may at any time within sixty (60) days of the performance of the last of the labor or the furnishing of the last of the material or other service and within thirty (30) days after the final acceptance of the improvement, file with the department a duly verified itemized statement of the amount due the person, firm, limited liability company, or corporation, stating whether the labor or material was performed for or furnished to a contractor or subcontractor, giving the name of the contractor or subcontractor and the dates the labor or material was performed or furnished, the rate or cost, the character of the labor, material, or service, and the post office address of the claimant.
As added by P.L.18-1990, SEC.218. Amended by P.L.8-1993, SEC.156.

Structure Indiana Code

Indiana Code

Title 8. Utilities and Transportation

Article 23. Indiana Department of Transportation

Chapter 9. State Highway Contracts; General Powers

8-23-9-0.1. Application of Certain Amendments to Chapter

8-23-9-1. Opening of Sealed Bids

8-23-9-2. Rejection of Proposals

8-23-9-3. Lowest and Best Bidder; Letting of Contract; Determination

8-23-9-4. Acceptance of Proposals; Criteria

8-23-9-4.5. Qualified Work Release Programs; Highway Right-of-Way Maintenance; Exception to Competitive Bid Requirements

8-23-9-5. Construction and Maintenance When No Satisfactory Proposal Received

8-23-9-6. Spending Limit When No Satisfactory Proposal Received

8-23-9-7. Adoption of Rules Governing Purchases of Material and Equipment

8-23-9-8. Bid Guarantee and Performance Bond Requirements

8-23-9-9. Bid Guarantee and Performance Bond Amounts

8-23-9-10. Performance Bonds; Deposit; Reinsurance; Statements of Amounts Due

8-23-9-11. Actions on Performance Bonds

8-23-9-12. Performance Bond Form

8-23-9-13. Trust Bids

8-23-9-14. Partial Payments; Authorization

8-23-9-15. Repealed

8-23-9-16. Acceptance of Completed Work; Relief of Contractor's Liability

8-23-9-17. Withdrawal and Payment of Retained Percentages

8-23-9-18. Final Payments; Disputes

8-23-9-19. Repealed

8-23-9-20. Repealed

8-23-9-21. Contract Form; Approval

8-23-9-22. Hourly Wage Rates

8-23-9-23. Residency Requirement for Unskilled Laborers

8-23-9-24. Survey Monuments; Procedure Upon Removal or Burial

8-23-9-25. Nonperformance or Abandonment of Contracts; Completion of Work; Costs and Expenses

8-23-9-26. Claims Against Contractors; Filing With Department

8-23-9-27. Claims Against Contractors; Mailing of Copies

8-23-9-28. Claims Against Contractors; Retaining Amount of Claim

8-23-9-29. Claims Against Contractors; Allowance or Rejection

8-23-9-30. Claims Against Contractors; Notice of Rejection; Commencement of Actions

8-23-9-31. Claims Against Contractors; Payment of Amount Adjudged Due

8-23-9-32. Claims Against Contractors; Failure to File Certificate

8-23-9-33. Claims Against Contractors; Additional Remedy

8-23-9-34. Claims Against Contractors; Filing of Actions

8-23-9-35. Claims Against Contractors; Mailing or Publication of Notice

8-23-9-36. Claims Against Contractors; Certificates of Filing of Actions

8-23-9-37. Claims Against Contractors; Retention of Security for Protection of Claimant

8-23-9-38. Claims Against Contractors; Failure to File Action and Certificate

8-23-9-39. Claims Against Contractors; Additional Proceedings

8-23-9-40. Railroad Crossings; Separation of Grades

8-23-9-41. Railroad Crossings; Separation of Grades; Rights, Powers, and Duties of Parties Involved

8-23-9-42. Railroad Crossings; Separation of Grades; Payment of Costs

8-23-9-43. Railroad Crossings; Separation of Grades; Multiple Railroads; Payment of Costs

8-23-9-44. Railroad Crossings; Separation of Grades; Maintenance

8-23-9-45. Railroad Crossings; Improvement and Maintenance

8-23-9-46. Railroad Crossings; Width of Improvements

8-23-9-47. Railroad Crossings; Election by Railroad Companies to Make or Pay for Improvements

8-23-9-48. Tearing Up and Disturbing Highways; Permit; Unauthorized Signs and Markers; Violations

8-23-9-49. Approaches and Drainage Structures; Construction; Private Facilities

8-23-9-50. Use of Prison Labor in Preparation and Manufacturing of Road Materials

8-23-9-51. Drains, Culverts, and Bridges; Bridge Construction Contracts

8-23-9-52. Contracts Specifying Borrow or Clearing and Grubbing; Standards

8-23-9-53. Trench Safety Systems; Costs

8-23-9-54. State Highway Fund; Creation and Management

8-23-9-55. Use of State Highway Fund

8-23-9-56. Research Assistance; Report to Joint Study Committee on Transportation and Infrastructure Assessment and Solutions

8-23-9-57. Cooperation With Federal and Other States' Officials

8-23-9-58. Utility Facilities; Costs and Delays Due to Facility Relocations; Contractor's Right to Compensation or Expenses

8-23-9-59. Application of Ic 5-22-16.5 to Award of Contracts Under Article