8-23-9-24. Survey Monuments; Procedure Upon Removal or Burial

Sec. 24. If in the construction or maintenance of a state highway it is necessary to remove or bury a monument marking or evidencing an established corner, the department shall cause to be set in the pavement or right-of-way at the place where the monument was located a monument capable of activating a metal detection device. The top of the monument must be level with the pavement or the grade of the right-of-way. The department shall cause a memorandum of the monument to be filed in the county surveyor's office of the county.
As added by P.L.18-1990, SEC.218.

Structure Indiana Code

Indiana Code

Title 8. Utilities and Transportation

Article 23. Indiana Department of Transportation

Chapter 9. State Highway Contracts; General Powers

8-23-9-0.1. Application of Certain Amendments to Chapter

8-23-9-1. Opening of Sealed Bids

8-23-9-2. Rejection of Proposals

8-23-9-3. Lowest and Best Bidder; Letting of Contract; Determination

8-23-9-4. Acceptance of Proposals; Criteria

8-23-9-4.5. Qualified Work Release Programs; Highway Right-of-Way Maintenance; Exception to Competitive Bid Requirements

8-23-9-5. Construction and Maintenance When No Satisfactory Proposal Received

8-23-9-6. Spending Limit When No Satisfactory Proposal Received

8-23-9-7. Adoption of Rules Governing Purchases of Material and Equipment

8-23-9-8. Bid Guarantee and Performance Bond Requirements

8-23-9-9. Bid Guarantee and Performance Bond Amounts

8-23-9-10. Performance Bonds; Deposit; Reinsurance; Statements of Amounts Due

8-23-9-11. Actions on Performance Bonds

8-23-9-12. Performance Bond Form

8-23-9-13. Trust Bids

8-23-9-14. Partial Payments; Authorization

8-23-9-15. Repealed

8-23-9-16. Acceptance of Completed Work; Relief of Contractor's Liability

8-23-9-17. Withdrawal and Payment of Retained Percentages

8-23-9-18. Final Payments; Disputes

8-23-9-19. Repealed

8-23-9-20. Repealed

8-23-9-21. Contract Form; Approval

8-23-9-22. Hourly Wage Rates

8-23-9-23. Residency Requirement for Unskilled Laborers

8-23-9-24. Survey Monuments; Procedure Upon Removal or Burial

8-23-9-25. Nonperformance or Abandonment of Contracts; Completion of Work; Costs and Expenses

8-23-9-26. Claims Against Contractors; Filing With Department

8-23-9-27. Claims Against Contractors; Mailing of Copies

8-23-9-28. Claims Against Contractors; Retaining Amount of Claim

8-23-9-29. Claims Against Contractors; Allowance or Rejection

8-23-9-30. Claims Against Contractors; Notice of Rejection; Commencement of Actions

8-23-9-31. Claims Against Contractors; Payment of Amount Adjudged Due

8-23-9-32. Claims Against Contractors; Failure to File Certificate

8-23-9-33. Claims Against Contractors; Additional Remedy

8-23-9-34. Claims Against Contractors; Filing of Actions

8-23-9-35. Claims Against Contractors; Mailing or Publication of Notice

8-23-9-36. Claims Against Contractors; Certificates of Filing of Actions

8-23-9-37. Claims Against Contractors; Retention of Security for Protection of Claimant

8-23-9-38. Claims Against Contractors; Failure to File Action and Certificate

8-23-9-39. Claims Against Contractors; Additional Proceedings

8-23-9-40. Railroad Crossings; Separation of Grades

8-23-9-41. Railroad Crossings; Separation of Grades; Rights, Powers, and Duties of Parties Involved

8-23-9-42. Railroad Crossings; Separation of Grades; Payment of Costs

8-23-9-43. Railroad Crossings; Separation of Grades; Multiple Railroads; Payment of Costs

8-23-9-44. Railroad Crossings; Separation of Grades; Maintenance

8-23-9-45. Railroad Crossings; Improvement and Maintenance

8-23-9-46. Railroad Crossings; Width of Improvements

8-23-9-47. Railroad Crossings; Election by Railroad Companies to Make or Pay for Improvements

8-23-9-48. Tearing Up and Disturbing Highways; Permit; Unauthorized Signs and Markers; Violations

8-23-9-49. Approaches and Drainage Structures; Construction; Private Facilities

8-23-9-50. Use of Prison Labor in Preparation and Manufacturing of Road Materials

8-23-9-51. Drains, Culverts, and Bridges; Bridge Construction Contracts

8-23-9-52. Contracts Specifying Borrow or Clearing and Grubbing; Standards

8-23-9-53. Trench Safety Systems; Costs

8-23-9-54. State Highway Fund; Creation and Management

8-23-9-55. Use of State Highway Fund

8-23-9-56. Research Assistance; Report to Joint Study Committee on Transportation and Infrastructure Assessment and Solutions

8-23-9-57. Cooperation With Federal and Other States' Officials

8-23-9-58. Utility Facilities; Costs and Delays Due to Facility Relocations; Contractor's Right to Compensation or Expenses

8-23-9-59. Application of Ic 5-22-16.5 to Award of Contracts Under Article