Sec. 14. The group shall conduct an annual study on the:
(1) use of;
(2) availability of; and
(3) economics of using;
in Indiana the clean energy resources listed in IC 8-1-37-4(a)(1) through IC 8-1-37-4(a)(6) and in IC 8-1-37-4(a)(22). The commission may direct the group to study additional clean energy resources as the commission considers appropriate. Each year, the group shall submit a report on the study to the commission for inclusion in the commission's annual report to the interim study committee on energy, utilities, and telecommunications established by IC 2-5-1.3-4 in an electronic format under IC 5-14-6. The commission shall direct the group concerning the appropriate level of detail for the report. The report must include suggestions from the group to encourage the development and use of clean energy resources and technologies appropriate for use in Indiana.
As added by P.L.159-2002, SEC.6. Amended by P.L.71-2009, SEC.2; P.L.150-2011, SEC.14; P.L.53-2014, SEC.78; P.L.152-2022, SEC.2.
Structure Indiana Code
Title 8. Utilities and Transportation
Article 1. Utilities Generally
Chapter 8.8. Utility Generation and Clean Coal Technology
8-1-8.8-1. Legislative Findings and Declaration of Purpose
8-1-8.8-2. "Clean Energy Projects"
8-1-8.8-3. "Clean Coal Technology"
8-1-8.8-4. "Coal Gasification Facility"
8-1-8.8-5. "Costs Associated With Qualified Utility System Property"
8-1-8.8-6. "Eligible Business"
8-1-8.8-8. "New Energy Production or Generating Facility"
8-1-8.8-8.5. "Nuclear Energy Production or Generating Facility"
8-1-8.8-8.7. "Qualified Utility System Expenses"
8-1-8.8-9. "Qualified Utility System Property"
8-1-8.8-10. "Renewable Energy Resources"
8-1-8.8-10.2. "Small Modular Nuclear Reactor"
8-1-8.8-12. Recovery of Costs; Rate Adjustment Mechanisms
8-1-8.8-13. Monthly Report to Lieutenant Governor Required