Sec. 7. The board:
(1) shall evaluate proposals received under this chapter with regard to net cost or net revenues; and
(2) in the manner consistent with provisions set forth in the requests for proposals, may evaluate proposals on the basis of additional factors such as the following:
(A) The technical evaluation of facility design.
(B) Net energy efficiency.
(C) Environmental protection.
(D) Overall system reliability.
(E) Financial condition of the proposer.
[Pre-1996 Recodification Citation: 13-9.5-8-3(5).]
As added by P.L.1-1996, SEC.11.
Structure Indiana Code
Article 21. Solid Waste Management Districts
13-21-6-1. Length, Duration, and Terms; Amendments, Extensions, and Supplements; Maximum Term
13-21-6-3. Request for Qualifications and Proposals
13-21-6-4. Notice; Time Limitations
13-21-6-6. Receipt of Proposals; Time Limitations
13-21-6-7. Criteria for Consideration in Evaluation of Proposals
13-21-6-8. Preliminary Contract Awards; Public Hearing; Notice; Final Form
13-21-6-9. Request for Proposals; Required Information
13-21-6-10. Contesting Validity of Contract Awarded; Time Limitation on Bringing Action