Sec. 10. An action to contest:
(1) the validity of a contract awarded; or
(2) the procedure by which the contract was awarded;
must be brought within thirty (30) days following the final contract award. After that date, the contract is incontestable for any cause.
[Pre-1996 Recodification Citation: 13-9.5-8-5.]
As added by P.L.1-1996, SEC.11.
Structure Indiana Code
Article 21. Solid Waste Management Districts
13-21-6-1. Length, Duration, and Terms; Amendments, Extensions, and Supplements; Maximum Term
13-21-6-3. Request for Qualifications and Proposals
13-21-6-4. Notice; Time Limitations
13-21-6-6. Receipt of Proposals; Time Limitations
13-21-6-7. Criteria for Consideration in Evaluation of Proposals
13-21-6-8. Preliminary Contract Awards; Public Hearing; Notice; Final Form
13-21-6-9. Request for Proposals; Required Information
13-21-6-10. Contesting Validity of Contract Awarded; Time Limitation on Bringing Action