Sec. 3. As used in this chapter, "construction plan" means a written plan that:
(1) presents information about a construction project and activities associated with the construction project;
(2) includes a storm water pollution prevention plan that outlines how erosion and sedimentation will be controlled on the site of the construction project; and
(3) must be submitted to a review authority as a condition of proceeding with the construction project under the general permit rule program established under 327 IAC 15-5 or the general permit.
As added by P.L.248-2019, SEC.14.
Structure Indiana Code
Article 18. Water Pollution Control
Chapter 27. Erosion and Sediment Control in Construction Projects
13-18-27-2. "Construction Activities"
13-18-27-3. "Construction Plan"
13-18-27-5. "Erosion and Sediment Control Measure"
13-18-27-7. "Large Construction Activity Site"
13-18-27-9. "Project Site Owner"
13-18-27-10. "Review Authority"
13-18-27-12. "Small Construction Activity Site"
13-18-27-13. "Trained Individual"
13-18-27-14. "Very Small Construction Activity Site"
13-18-27-15. Restriction on Ms4 Community's Erosion and Sediment Control Measures
13-18-27-18. Limitation on Authority of Ms4 Community to Order Construction Project to Stop
13-18-27-19. General Permit Must Be Consistent With This Chapter