Sec. 18. (a) If:
(1) an MS4 community has made a conclusive favorable determination concerning a construction plan; and
(2) work on the construction project has begun;
the MS4 community may not order work on the construction project to stop on the grounds that the erosion and sediment control measures included in the construction plan are not adequate unless the project site owner is notified in writing of the inadequacies that the MS4 community perceives in the erosion and sediment control measures and the perceived inadequacies are not resolved within seventy-two (72) hours after the project site owner receives the written notice.
(b) This section does not prohibit an MS4 community from ordering work on a construction project to stop if the project site owner is creating a public health hazard or a safety hazard.
As added by P.L.248-2019, SEC.14.
Structure Indiana Code
Article 18. Water Pollution Control
Chapter 27. Erosion and Sediment Control in Construction Projects
13-18-27-2. "Construction Activities"
13-18-27-3. "Construction Plan"
13-18-27-5. "Erosion and Sediment Control Measure"
13-18-27-7. "Large Construction Activity Site"
13-18-27-9. "Project Site Owner"
13-18-27-10. "Review Authority"
13-18-27-12. "Small Construction Activity Site"
13-18-27-13. "Trained Individual"
13-18-27-14. "Very Small Construction Activity Site"
13-18-27-15. Restriction on Ms4 Community's Erosion and Sediment Control Measures
13-18-27-18. Limitation on Authority of Ms4 Community to Order Construction Project to Stop
13-18-27-19. General Permit Must Be Consistent With This Chapter