When as many streets and entire blocks of streets in any section have been paved as the amount allotted to that section will permit, and there still remains a balance insufficient to pave an entire block of the street provided for pavement upon the schedule, such balance shall remain available and be added to the allotment for that section for the next succeeding year.
(June 6, 1900, 31 Stat. 559, ch. 789.)
1981 Ed., § 7-624.
1973 Ed., § 7-619.
Structure District of Columbia Code
Title 9 - Transportation Systems
Chapter 4 - Street Repair and Construction
§ 9–401.01. Cost of construction and repairs; payments
§ 9–401.02. Removal of street railway tracks
§ 9–401.03. Water and gas mains, service pipes, and sewer connections
§ 9–401.04. Assessments for sidewalks and curbing
§ 9–401.05. Mayor to submit schedules of streets to be improved
§ 9–401.06. Improvement and repairs of alleys and sidewalks; construction of sewers and sidewalks
§ 9–401.07. Repayments from Permit Fund
§ 9–401.08. Service connections with water mains and sewer
§ 9–401.09. Paving or resurfacing roadway of streets, avenues, and roads
§ 9–401.10. Assessments for costs of paving streets
§ 9–401.11. Width of pavement of streets
§ 9–401.12. Minor changes in roadway width
§ 9–401.13. Use of bituminous macadam authorized
§ 9–401.14. Use of portable asphalt plant
§ 9–401.15. Unexpended allotments for street paving made available for succeeding year
§ 9–401.16. Limitation on contracts of Mayor
§ 9–401.17. Contracts for repairs not to exceed 5 years
§ 9–401.18. Exemptions of abutting property from deposits and assessments