The use of bituminous macadam is authorized on streets, avenues, and roads to be improved or paved.
(June 26, 1912, 37 Stat. 150, ch. 182.)
1981 Ed., § 7-622.
1973 Ed., § 7-617.
Structure District of Columbia Code
Title 9 - Transportation Systems
Chapter 4 - Street Repair and Construction
§ 9–401.01. Cost of construction and repairs; payments
§ 9–401.02. Removal of street railway tracks
§ 9–401.03. Water and gas mains, service pipes, and sewer connections
§ 9–401.04. Assessments for sidewalks and curbing
§ 9–401.05. Mayor to submit schedules of streets to be improved
§ 9–401.06. Improvement and repairs of alleys and sidewalks; construction of sewers and sidewalks
§ 9–401.07. Repayments from Permit Fund
§ 9–401.08. Service connections with water mains and sewer
§ 9–401.09. Paving or resurfacing roadway of streets, avenues, and roads
§ 9–401.10. Assessments for costs of paving streets
§ 9–401.11. Width of pavement of streets
§ 9–401.12. Minor changes in roadway width
§ 9–401.13. Use of bituminous macadam authorized
§ 9–401.14. Use of portable asphalt plant
§ 9–401.15. Unexpended allotments for street paving made available for succeeding year
§ 9–401.16. Limitation on contracts of Mayor
§ 9–401.17. Contracts for repairs not to exceed 5 years
§ 9–401.18. Exemptions of abutting property from deposits and assessments