The project owner shall provide copies of those portions of the drawings that affect the respective operator with underground utility lines in the project area who have responded in accordance with § 56-265.17:3.
2002, c. 841.
Structure Code of Virginia
Title 56 - Public Service Companies
Chapter 10.3 - Underground Utility Damage Prevention Act
§ 56-265.15. Definitions; calculation of time periods
§ 56-265.15:1. Exemptions; routine maintenance
§ 56-265.16:1. Operators to join notification centers; certification
§ 56-265.17:1. Notification and procedures for designers
§ 56-265.17:2. Procedures for project owners
§ 56-265.17:3. Procedures for operators in response to a designer notice
§ 56-265.18. Notification requirements
§ 56-265.19. Duties of operator; regulations
§ 56-265.19:1. Private sewer laterals and sewer system laterals
§ 56-265.20:1. Locating nonmetallic underground utility lines
§ 56-265.22:1. Meetings between excavators and operators
§ 56-265.24. Duties of excavator
§ 56-265.25. Liability of operator and excavator; penalties
§ 56-265.26:1. Utility line depth requirement
§ 56-265.28. Sovereign immunity
§ 56-265.29. Other similar laws
§ 56-265.30. Authority of the State Corporation Commission