Sec. 363.003.  DUTY TO REPAIR;  FORFEIT OF TOLLS.  (a)  The contractor shall maintain the bridge during the term of the contract.
(b)  A contractor who fails to maintain the bridge forfeits all right to the tolls.
Acts 1995, 74th Leg., ch. 165, Sec. 1, eff. Sept. 1, 1995.