Texas Statutes
Subchapter C. General Procedures for Rate Changes Proposed by Utility
Section 36.110. Bonded Rates

Sec. 36.110. BONDED RATES. (a) An electric utility may put a changed rate into effect throughout the area in which the utility sought to change its rates, including an area over which the commission is exercising appellate or original jurisdiction, by filing a bond with the commission if:
(1) the 150-day suspension period has been extended under Section 36.108(b); and
(2) the commission fails to make a final determination before the 151st day after the date the rate change would otherwise be effective.
(b) The bonded rate may not exceed the proposed rate.
(c) The bond must be:
(1) payable to the commission in an amount, in a form, and with a surety approved by the commission; and
(2) conditioned on refund.
(d) The electric utility shall refund or credit against future bills:
(1) money collected under the bonded rates in excess of the rate finally ordered; and
(2) interest on that money, at the current interest rate as determined by the commission.
Acts 1997, 75th Leg., ch. 166, Sec. 1, eff. Sept. 1, 1997.