Sec. 251.151. DUTY OF AN EXCAVATOR. (a) Except as provided by Sections 251.155 and 251.156, a person who intends to excavate shall notify a notification center not earlier than the 14th day before the date the excavation is to begin or later than the 48th hour before the time the excavation is to begin, excluding Saturdays, Sundays, and legal holidays.
(b) Notwithstanding Subsection (a), if an excavator makes a Saturday notification, the excavator may begin the excavation the following Tuesday at 11:59 a.m. unless the intervening Monday is a holiday. If the intervening Monday is a holiday, the excavator may begin the excavation the following Wednesday at 11:59 a.m.
(c) To have a representative present during the excavation, the operator shall contact the excavator and advise the excavator of the operator's intent to be present during excavation and confirm the start time of the excavation. If the excavator wants to change the start time, the excavator shall notify the operator to set a mutually agreed-to time to begin the excavation.
Added by Acts 1999, 76th Leg., ch. 62, Sec. 18.17(a), eff. Sept. 1, 1999.
Structure Texas Statutes
Title 5 - Provisions Affecting the Operation of Utility Facilities
Chapter 251 - Underground Facility Damage Prevention and Safety
Subchapter D. Requirements Relating to Excavation
Section 251.151. Duty of an Excavator
Section 251.152. Information Included in Notice
Section 251.153. Duty of Notification Center
Section 251.154. Notification by an Excavator
Section 251.155. Exception in Case of Emergency; Offense
Section 251.156. Other Exceptions to Duty of Excavators
Section 251.157. Duty of Operator to Person Excavating
Section 251.158. Duty of Operator in Event of an Extraordinary Circumstance