Sec. 2166.155. ESTIMATE OF PROJECT COSTS IN LIEU OF PROJECT ANALYSIS. (a) If the commission determines that the cost of a project analysis is not justified or required, the commission shall, in cooperation with the using agency, develop a realistic estimate of the project's cost.
(b) If necessary, the commission shall arrange for an on-site inspection and analysis of the proposed project by a commission staff member.
(c) The commission shall inform a using agency of a cost estimate developed under this section.
Added by Acts 1995, 74th Leg., ch. 41, Sec. 1, eff. Sept. 1, 1995.
Structure Texas Statutes
Subtitle D - State Purchasing and General Services
Chapter 2166 - Building Construction and Acquisition and Disposition of Real Property
Subchapter D. Individual Project Analysis
Section 2166.151. Using Agency's General Project Description; Initiation of Project Analysis Process
Section 2166.152. Preparation of Project Analysis
Section 2166.153. Contents of Project Analysis
Section 2166.154. Use of Project Analysis or Cost Estimate in Appropriations Process
Section 2166.155. Estimate of Project Costs in Lieu of Project Analysis
Section 2166.156. Preparation of Preliminary and Working Plans and Specifications