(A)(1) A new surface water withdrawer that owns and operates a licensed impoundment that utilizes water withdrawn from its licensed impoundment and the withdrawals are subject to review and approval of applicable state and federal laws and regulations, including its impoundment licensing authority, shall be issued a surface water withdrawal permit upon proper application.
(2) Any other new surface water withdrawer that utilizes water withdrawn from a licensed impoundment shall be issued a surface water withdrawal permit upon proper application in accordance with the criteria contained in this chapter. If this new surface water withdrawer has been issued a license, permit, or certification through a state or federal process that reviewed criteria substantially similar to some or all of the surface water withdrawal criteria contained in this chapter, then the application for the new surface water withdrawal is only required to address the criteria not addressed when the new surface water withdrawer was issued a license, permit, or certification through a state or federal process.
(B) Permits issued pursuant to this section will be required to identify the surface water withdrawer, the point of withdrawal, and the maximum withdrawal amounts and also will require that the applicant comply with the reporting requirements of Section 49-4-50.
(C) Nothing in this chapter shall be construed to diminish the department's authority to regulate facilities under any other applicable laws.
HISTORY: 2010 Act No. 247, Section 1, eff January 1, 2011.
Editor's Note
2010 Act No. 247, Section 4.B, provides:
"Chapter 1, Title 49 of the 1976 Code is not affected by and supersedes Chapter 4, Title 49 of the 1976 Code, as amended by SECTION 1 of this act."
Structure South Carolina Code of Laws
Title 49 - Waters, Water Resources and Drainage
Chapter 4 - South Carolina Surface Water Withdrawal, Permitting Use, And Reporting Act
Section 49-4-25. Surface water withdrawal permit required.
Section 49-4-40. Applications and permits for surface water withdrawals.
Section 49-4-45. New surface water withdrawers; review and approval; reporting requirements.
Section 49-4-50. Reports of quantity of water withdrawn; methods for determining quantity.
Section 49-4-60. Use of surface water on nonriparian land.
Section 49-4-100. Surface water withdrawal permits; contents; valid for certain time period.
Section 49-4-110. Effect of surface water withdrawal permit.
Section 49-4-120. Modification, suspension and revocation of permit; conditions; renewal of permit.
Section 49-4-130. Notice of construction of new surface water intake required.
Section 49-4-140. Temporary surface water withdrawal permit; necessity.
Section 49-4-170. Powers and duties of department.
Section 49-4-175. Authority to collect, and the amount of, surface water withdrawal permit fees.