§ 28-25-11. Issuance of certificate — Period of validity — Display.
Whenever: (1) The division has inspected any boiler or pressure vessel and has found it safe for operation; (2) Any repairs required by the division to be made in any boiler or pressure vessel have been completed to its satisfaction; (3) In the case of any boiler or pressure vessel subsequently installed the administrator has satisfied himself or herself by inspection, or otherwise, that it may be safely operated; or (4) In the case of any boiler or pressure vessel subsequently erected, he or she has satisfied himself or herself that the boiler or pressure vessel complies with the standard established under § 28-25-9, he or she shall, upon payment of the required fee, issue to the owner of the boiler or pressure vessel his or her certificate authorizing the operation of the boiler or pressure vessel and stating the limit of pressure at which the boiler or pressure vessel may be used, and stating the date of issue of the certificate. The date of issue of the certificate shall be the date of approved inspection and the certificate shall be valid for a period of time determined and adopted by the code commission. Each certificate shall be conspicuously posted by the owner of the boiler or pressure vessel. If the boiler or pressure vessel is not located within the building, the certificate shall be posted in a location convenient to the boiler or pressure vessel inspected or in any place where it will be accessible to the interested parties.
History of Section.P.L. 1919, ch. 1770, § 7; G.L. 1923, ch. 94, § 7; G.L. 1938, ch. 297, § 7; G.L. 1956, § 28-25-9; P.L. 1985, ch. 508, § 1.
Structure Rhode Island General Laws
Title 28 - Labor and Labor Relations
Chapter 28-25 - Boiler Inspection and Pressure Vessels
Section 28-25-1. - Definitions.
Section 28-25-2. - [Transferred.]
Section 28-25-3. - Chief inspector.
Section 28-25-4. - Authorized inspectors.
Section 28-25-5. - Administration and enforcement.
Section 28-25-6. - Method of inspection.
Section 28-25-7. - Access to boilers and pressure vessels — Time of inspection.
Section 28-25-8. - Orders to cease operation or repair.
Section 28-25-9. - Formulation and adoption of codes, rules, and regulations.
Section 28-25-11. - Issuance of certificate — Period of validity — Display.
Section 28-25-12. - Inspection fees.
Section 28-25-13. - Reports by authorized inspectors — Certificate — Defective boilers.
Section 28-25-14. - Request for board hearing.
Section 28-25-15. - [Repealed.]
Section 28-25-16. - Penalty for violations — Complaints.
Section 28-25-17. - Judicial enforcement.
Section 28-25-18. - Exemptions.
Section 28-25-19. - Inspection of unfired pressure vessels being manufactured.
Section 28-25-20. - Reports to general assembly and governor.
Section 28-25-21. - Local ordinances void.