Rhode Island General Laws
Article 2 - New Buildings and Structures
Section 23-27.3-114.1. - Action on application.

§ 23-27.3-114.1. Action on application.
(a) The building official shall examine or cause to be examined all applications for permits and amendments thereto within fifteen (15) days after filing. Before a permit is granted for the excavation or for the erection of any building or structure, a written statement shall be furnished by the owner from a town or city engineer as to the established grades. If the application or plans do not conform to the requirements of this code or of all applicable laws, the building official shall reject the application citing the specific sections of this code or applicable law upon which the rejection is based. If the building official is satisfied that the proposed work conforms to the requirements of this code and all laws applicable thereto, he or she shall issue a permit.
(b) In cases where the permit application is for the construction of a new residential dwelling occupied by one, two (2), and/or three (3) families, the building official shall reject the application or issue the permit within forty-five (45) calendar days after the filing of the application. If after forty-five (45) calendar days the application has not been either rejected or a permit issued, the permit fee shall be reduced by fifty percent (50%). The review period shall begin on the date when the application is filed with the building official and shall include any actions on the application required by subsection (a) herein, subsection 23-28.1-2(b)(2) and 23-28.1-6 and actions by any other departments with authority over the issuance of the permit.
(c) In cases where the permit application is for the rehabilitation of an existing residential dwelling occupied by one, two (2), and/or three (3) families and affecting not more than fifty percent (50%) of the square footage of the original dwelling, the building official shall reject the application or issue the permit within fifteen (15) calendar days after the filing of the application. If after fifteen (15) calendar days the application has not been either rejected or a permit issued, the permit fee shall be reduced by fifty percent (50%). The provisions of this subsection shall apply to actions by other departments with authority over the issuance of the permit except in cases where the permit application requires plan review under §§ 23-28.1-2(b)(2) and 23-28.1-6.
(d) In cases where the permit application is for the rehabilitation of an existing residential dwelling occupied by one, two (2), and/or three (3) families and affecting more than fifty percent (50%) of the square footage of the original dwelling, the building official shall reject the application or issue the permit within forty-five (45) calendar days after the filing of the application. If, after forty-five (45) calendar days, the application has not been either rejected or a permit issued, the permit fee shall be reduced by fifty percent (50%). The provisions of this subsection shall apply to actions by other departments with authority over the issuance of the permit except in cases where the permit application requires plan review under sections 23-28.1-2(b)(2) and 23-28.1-6.
(e) In cases where the permit application is for the construction of a new or existing light commercial building affecting not more than fifty thousand square feet (50,000 sq ft), the building official shall reject the application or issue the permit within forty-five (45) calendar days after the filing of the application. If, after forty-five (45) calendar days, the application has not been either rejected or a permit issued, the permit fee shall be reduced by fifty percent (50%). The provisions of this subsection shall apply to actions by other departments with authority over the issuance of the permit except in cases where the permit application requires plan review under sections 23-28.1-2(b)(2) and 23-28.1-6.
(f) If an application requires access by driveway to a state highway or state highway right of way, or the placement or alteration of curbs, or the connecting to, pumping or draining water to, the state highway drainage system, or making any alteration to the state highway system, a physical alteration permit shall first be obtained from the director of the department of transportation pursuant to rules and regulations promulgated under §§ 24-8-9, 24-8-33 and 24-8-34. The issuance of a physical alteration permit shall be a requirement for issuance of a building permit; however, the lack of a physical alteration permit shall not be cause for a building official to delay examination of the building permit application. The director of the department of transportation shall respond within thirty (30) business days; provided, however, the director of the department of transportation may extend the timeline for unusual circumstances or for complex projects.
History of Section.P.L. 1976, ch. 256, § 1; P.L. 1992, ch. 401, § 1; P.L. 2007, ch. 159, § 1; P.L. 2007, ch. 275, § 1; P.L. 2008, ch. 301, § 1; P.L. 2008, ch. 425, § 1; P.L. 2008, ch. 475, § 71; P.L. 2011, ch. 174, § 1; P.L. 2011, ch. 323, § 1; P.L. 2012, ch. 220, § 1; P.L. 2012, ch. 229, § 1.

Structure Rhode Island General Laws

Rhode Island General Laws

Title 23 - Health and Safety

Chapter 23-27.3 - State Building Code

Article 2 - New Buildings and Structures

Section 23-27.3-111.0. - New and altered building and structure — Inspections.

Section 23-27.3-111.1. - Preliminary inspection.

Section 23-27.3-111.2. - Inspection.

Section 23-27.3-111.3. - Manufacturing buildings.

Section 23-27.3-111.3.1. - Plant inspection.

Section 23-27.3-111.3.2. - Installation site inspection.

Section 23-27.3-111.4. - Existing buildings.

Section 23-27.3-111.4.1. - Periodic inspections.

Section 23-27.3-111.4.2. - Repealed.

Section 23-27.3-111.5. - Final inspection.

Section 23-27.3-111.6. - Inspection services.

Section 23-27.3-111.7. - Coordination of inspections.

Section 23-27.3-112.0. - Right of entry.

Section 23-27.3-112.1. - Official identification card.

Section 23-27.3-112.2. - Municipal cooperation.

Section 23-27.3-113.0. - Application for permit.

Section 23-27.3-113.1. - When permit is required.

Section 23-27.3-113.1.1. - Issuance of permits for siding.

Section 23-27.3-113.2. - Form of application.

Section 23-27.3-113.3. - By whom application is made.

Section 23-27.3-113.3.1. - Applications for work requiring licensed workers.

Section 23-27.3-113.3.2. - Applications for work requiring registered workers.

Section 23-27.3-113.4. - Description of work.

Section 23-27.3-113.5. - Plans and specifications.

Section 23-27.3-113.5.1. - Repealed.

Section 23-27.3-113.6. - Plot plan.

Section 23-27.3-113.6.1. - Approval of an individual sewage disposal system.

Section 23-27.3-113.7. - Engineering details.

Section 23-27.3-113.8. - Amendments to application.

Section 23-27.3-113.9. - Time limitation on application.

Section 23-27.3-114.0. - Permits.

Section 23-27.3-114.1. - Action on application.

Section 23-27.3-114.1.1. - Reports to assessors.

Section 23-27.3-114.2. - Expiration of permit.

Section 23-27.3-114.3. - Previous approvals.

Section 23-27.3-114.3.1. - Drawings and specifications.

Section 23-27.3-114.4. - Building official to sign permit.

Section 23-27.3-114.5. - Approved plans.

Section 23-27.3-114.6. - Revocation of permits.

Section 23-27.3-114.7. - Approval in part.

Section 23-27.3-114.8. - Posting of permit.

Section 23-27.3-114.9. - Notice of building start.

Section 23-27.3-115.0. - Conditions of permit.

Section 23-27.3-115.1. - Compliance with code.

Section 23-27.3-115.2. - Compliance with permit.

Section 23-27.3-115.3. - Compliance with plot plan.

Section 23-27.3-115.4. - Change in plot plan.

Section 23-27.3-115.5. - Dismissal of contractor or subcontractor.

Section 23-27.3-115.6. - Electronic construction permitting.

Section 23-27.3-116.0. - Moving, raising, shoring, or demolition of buildings.

Section 23-27.3-116.1. - Service connections.

Section 23-27.3-116.2. - Buildings to be rodent-eradicated prior to demolition.

Section 23-27.3-116.3. - Description and inspection of buildings — Travel route.

Section 23-27.3-116.4. - Agreement condition to moving.

Section 23-27.3-116.5. - Public utilities, wires, poles, trees, and shrubs.

Section 23-27.3-116.6. - Moving to be continuous.

Section 23-27.3-116.7. - Watchperson and lights during moving.

Section 23-27.3-116.8. - Bonds and liability insurance.

Section 23-27.3-116.9. - Shoring.

Section 23-27.3-117.0. - Removal of structures.

Section 23-27.3-117.1. - Lot regulation.

Section 23-27.3-118.0. - Fees.

Section 23-27.3-118.1. - Special fees.

Section 23-27.3-118.2. - Ramps for disabled persons.

Section 23-27.3-119.0. - Fee computation.

Section 23-27.3-120.0. - Certificate of use and occupancy.

Section 23-27.3-120.1. - New buildings.

Section 23-27.3-120.2. - Buildings hereafter altered.

Section 23-27.3-120.3. - Existing buildings.

Section 23-27.3-120.4. - Changes in use and occupancy.

Section 23-27.3-120.5. - Temporary occupancy.

Section 23-27.3-120.6. - Contents of certificate.

Section 23-27.3-121.0. - Posting buildings.

Section 23-27.3-121.1. - Posted use and occupancy.

Section 23-27.3-121.2. - Posted occupancy load.

Section 23-27.3-121.3. - Furnishing of posted signs.

Section 23-27.3-121.4. - Periodic inspection for posting.

Section 23-27.3-122.0. - Violations.

Section 23-27.3-122.1. - Notice of violation.

Section 23-27.3-122.1.2. - Notice or orders — Service and content.

Section 23-27.3-122.2. - Prosecution of violation.

Section 23-27.3-122.3. - Penalties.

Section 23-27.3-122.4. - Abatement of violations.

Section 23-27.3-123.0. - Stop-work order.

Section 23-27.3-123.1. - Notice to owner.

Section 23-27.3-123.1.1. - Posting of order.

Section 23-27.3-123.2. - Unlawful continuance.

Section 23-27.3-124.0. - Unsafe structures — General provisions.

Section 23-27.3-124.1. - Unsafe conditions.

Section 23-27.3-124.2. - Notice of unsafe condition.

Section 23-27.3-124.3. - Appeals.

Section 23-27.3-124.4. - Restoration of unsafe buildings.

Section 23-27.3-124.4.1. - Compliance.

Section 23-27.3-124.5. - Disregard of unsafe notice.

Section 23-27.3-124.6. - Boarding.

Section 23-27.3-124.6.1. - Disconnection of utilities.

Section 23-27.3-124.6.2. - Removal of debris and rubbish.

Section 23-27.3-125.0. - Emergency measures.

Section 23-27.3-125.1. - Vacating buildings.

Section 23-27.3-125.2. - Temporary safeguards.

Section 23-27.3-125.3. - Closing streets.

Section 23-27.3-125.4. - Emergency repairs.

Section 23-27.3-125.5. - Hazardous buildings.

Section 23-27.3-125.6. - Costs of emergency repairs.

Section 23-27.3-125.7. - Lien for emergency repairs.

Section 23-27.3-126.0. - Appeals from orders in regard to unsafe buildings.

Section 23-27.3-126.1. - Application for review.

Section 23-27.3-126.2. - Procedure.

Section 23-27.3-126.3. - Findings.

Section 23-27.3-127.0. - State and local boards of appeals.

Section 23-27.3-127.1. - Committee to serve as a board of standards and appeals.

Section 23-27.3-127.1.1. - Stay of proceedings.

Section 23-27.3-127.1.2. - Granting variance.

Section 23-27.3-127.1.3. - Additional powers.

Section 23-27.3-127.1.4. - Procedures — Record of variances.

Section 23-27.3-127.2. - Local board of appeals.

Section 23-27.3-127.2.1. - Membership and local board.

Section 23-27.3-127.2.2. - Stay of proceedings.

Section 23-27.3-127.2.3. - Granting variance.

Section 23-27.3-127.2.4. - Additional powers.

Section 23-27.3-127.2.5. - Procedures.

Section 23-27.3-127.2.6. - Local decision transmitted to state board.

Section 23-27.3-128.0. - Design and construction procedures.

Section 23-27.3-128.1. - Scope.

Section 23-27.3-128.1.1. - Owner’s responsibilities.

Section 23-27.3-128.1.2 - — 23-27.3-128.1.5. Repealed.

Section 23-27.3-128.2. - Repealed.

Section 23-27.3-128.2.1. - Drawings and specifications.

Section 23-27.3-128.2.2. - Responsibilities.

Section 23-27.3-128.2.3. - Reporting.

Section 23-27.3-128.3. - Construction contractor responsibilities.

Section 23-27.3-128.4. - Testing required.

Section 23-27.3-128.5. - Building official’s responsibilities.

Section 23-27.3-128.5.1. - Waiver of plan examination.

Section 23-27.3-128.5.2. - Waiver of detailed field inspection.

Section 23-27.3-128.5.3. - Inspection waiver — Utilization.

Section 23-27.3-128.5.4. - Building permit issuance or requirements.

Section 23-27.3-128.6. - Special technical services.

Section 23-27.3-128.7. - Fees and costs.

Section 23-27.3-129.0, 23-27.3-129.1. - Repealed.

Section 23-27.3-129.2. - Repealed.

Section 23-27.3-129.3. - Repealed.