Revised Code of Washington
Chapter 90.46 - Reclaimed Water Use.
90.46.240 - Plans, reports, specifications, and proposed methods of operation and maintenance to be submitted to departments.

RCW 90.46.240
Plans, reports, specifications, and proposed methods of operation and maintenance to be submitted to departments.

All required feasibility studies, planning documents, engineering reports, and plans and specifications for the construction of new reclaimed water, agricultural industrial process water, and industrial reuse water facilities, including generation, distribution, and use facilities, or for improvements or extensions to existing facilities, and the proposed method of future operation and maintenance of said facility or facilities, shall be submitted to and be approved by the lead agency, before construction thereof may begin. No approval shall be given until the lead agency is satisfied that the plans, reports, and specifications and the methods of operation and maintenance submitted are adequate to protect the quality of the water for the intended use as provided for in this chapter and are adequate to protect public health and safety as necessary.

[ 2009 c 456 § 11.]

Structure Revised Code of Washington

Revised Code of Washington

Title 90 - Water Rights—Environment

Chapter 90.46 - Reclaimed Water Use.

90.46.005 - Findings—Coordination of efforts—Development of facilities encouraged.

90.46.010 - Definitions.

90.46.015 - Rules—Coordination with department of health—Consultation with advisory committee.

90.46.020 - Interim standards for pilot projects for use of reclaimed water.

90.46.030 - Standards, procedures, and guidelines for industrial and commercial use of reclaimed water—Reclaimed water permits—Fee structure for permits—Formal agreements between the departments of health and ecology.

90.46.040 - Standards, procedures, and guidelines for land applications of reclaimed water.

90.46.042 - Standards, procedures, and guidelines for direct recharge.

90.46.044 - Standards, procedures, and guidelines for discharge to wetlands.

90.46.050 - Advisory committee—Development of standards, procedures, and guidelines.

90.46.070 - Exemption from standards, procedures, and guidelines.

90.46.072 - Conflict resolution—Reclaimed water projects and chapter 372-32 WAC.

90.46.080 - Use of reclaimed water for surface percolation—Establishment of discharge limit for contaminants.

90.46.090 - Use of reclaimed water for discharge into constructed beneficial use wetlands and constructed treatment wetlands—Standards for discharge.

90.46.100 - Discharge of reclaimed water for streamflow augmentation.

90.46.110 - Reclaimed water demonstration program—Demonstration projects.

90.46.120 - Use of water from wastewater treatment facility—Consideration in regional water supply plan or potable water supply plans—Consideration in reviewing provisions for water supplies for short plat, short subdivision, or subdivision—Report to...

90.46.130 - Impairment of water rights downstream from freshwater discharge points.

90.46.140 - Greywater reuse—Standards, procedures, and guidelines—Rules.

90.46.150 - Agricultural industrial process water—Permit—Use—Referral to department of health.

90.46.160 - Industrial reuse water—Permit.

90.46.200 - Authority of the departments of ecology and health—Lead agency—Duties.

90.46.210 - Lead agency—Authority to bring legal proceeding.

90.46.220 - Permit.

90.46.230 - Right to enter and inspect property related to the purpose of the permit—Administrative search warrant.

90.46.240 - Plans, reports, specifications, and proposed methods of operation and maintenance to be submitted to departments.

90.46.250 - Violation of chapter—Notification—Immediate action.

90.46.260 - Penalty.

90.46.270 - Violations—Civil penalty—Procedure.

90.46.280 - Application of administrative procedure act to chapter.

90.46.290 - On-site nonpotable water systems—Risk-based water quality standards—Adoption of rules.