RCW 90.03.320
Appropriation procedure—Construction work.
Actual construction work shall be commenced on any project for which permit has been granted within such reasonable time as shall be prescribed by the department, and shall thereafter be prosecuted with diligence and completed within the time prescribed by the department. The department, in fixing the time for the commencement of the work, or for the completion thereof and the application of the water to the beneficial use prescribed in the permit, shall take into consideration the cost and magnitude of the project and the engineering and physical features to be encountered, and shall allow such time as shall be reasonable and just under the conditions then existing, having due regard for the public welfare and public interests affected. For good cause shown, the department shall extend the time or times fixed as aforesaid, and shall grant such further period or periods as may be reasonably necessary, having due regard to the good faith of the applicant and the public interests affected. Good cause includes prevention or restriction of water use by operation of federal laws for the time or times fixed for commencing work, completing work, and applying water to beneficial use otherwise authorized under a water right permit issued for a federal reclamation project. In fixing construction schedules and the time, or extension of time, for application of water to beneficial use for municipal water supply purposes, the department shall also take into consideration the term and amount of financing required to complete the project, delays that may result from planned and existing conservation and water use efficiency measures implemented by the public water system, and the supply needs of the public water system's service area, consistent with an approved comprehensive plan under chapter 36.70A RCW, or in the absence of such a plan, a county-approved comprehensive plan under chapter 36.70 RCW or a plan approved under chapter 35.63 RCW, and related water demand projections prepared by public water systems in accordance with state law. An existing comprehensive plan under chapter 36.70A or 36.70 RCW, plan under chapter 35.63 RCW, or demand projection may be used. If the terms of the permit or extension thereof, are not complied with the department shall give notice by registered mail that such permit will be canceled unless the holders thereof shall show cause within sixty days why the same should not be so canceled. If cause is not shown, the permit shall be canceled.
[ 1999 c 400 § 1; 1997 c 445 § 3; 1987 c 109 § 67; 1917 c 117 § 33; RRS § 7385. Formerly RCW 90.20.090.]
NOTES:
Purpose—Short title—Construction—Rules—Severability—Captions—1987 c 109: See notes following RCW 43.21B.001.
Structure Revised Code of Washington
Title 90 - Water Rights—Environment
90.03.005 - State water policy—Cooperation with other agencies—Reduction of wasteful practices.
90.03.010 - Appropriation of water rights—Existing rights preserved.
90.03.020 - Units of water measurement.
90.03.040 - Eminent domain—Use of water declared public use.
90.03.060 - Water masters—Appointment, compensation.
90.03.070 - Water masters—Duties—Office space and equipment—Clerical assistance.
90.03.090 - Water master's power of arrest.
90.03.100 - Prosecuting attorney, legal assistant.
90.03.105 - Petition by planning units for general adjudication.
90.03.110 - Determination of water rights—Petition—Statement and plan.
90.03.130 - Determination of water rights—Service of summons.
90.03.140 - Determination of water rights—Adjudication claim by defendant.
90.03.150 - Determination of water rights—Guardian ad litem for defendant.
90.03.180 - Determination of water rights—Filing fee.
90.03.210 - Determination of water rights—Interim regulation of water—Appeals.
90.03.220 - Determination of water rights—Failure to appear—Estoppel.
90.03.230 - Determination of water rights—Copy of decree to director.
90.03.240 - Determination of water rights—Certificate of adjudicated water right—Notice—Fees.
90.03.245 - Determination of water rights—Scope.
90.03.250 - Appropriation procedure—Application for permit—Temporary permit.
90.03.260 - Appropriation procedure—Application—Contents.
90.03.270 - Appropriation procedure—Record of application.
90.03.280 - Appropriation procedure—Notice.
90.03.300 - Appropriation procedure—Diversion of water for out-of-state use—Reciprocity.
90.03.310 - Appropriation procedure—Assignability of permit or application.
90.03.320 - Appropriation procedure—Construction work.
90.03.330 - Appropriation procedure—Water right certificate.
90.03.340 - Appropriation procedure—Effective date of water right.
90.03.360 - Controlling works and measuring devices—Metering of diversions—Impact on fish stock.
90.03.383 - Interties—Findings—Definitions—Review and approval.
90.03.390 - Temporary changes—Emergency interties—Rotation in use.
90.03.395 - Change of point of diversion to downstream intake structure—Intent.
90.03.400 - Crimes against water code—Unauthorized use of water.
90.03.420 - Crimes against water code—Obstruction of right-of-way.
90.03.430 - Partnership ditches—Action for reimbursement for work done.
90.03.440 - Partnership ditches—Procedure for division of water between joint owners.
90.03.450 - Partnership ditches—Lien for labor performed.
90.03.460 - Inchoate rights not affected.
90.03.471 - Disposition of fees.
90.03.500 - Stormwater control facilities—Imposition of rates and charges—Legislative findings.
90.03.520 - Stormwater control facilities—Imposition of rates and charges—Definitions.
90.03.540 - Highway construction improvement projects—Joint stormwater treatment facilities.
90.03.550 - Municipal water supply purposes—Beneficial uses.
90.03.560 - Municipal water supply purposes—Identification.
90.03.580 - Failing public water system—Conditions.
90.03.590 - Municipal water suppliers—Watershed agreement—Pilot project.
90.03.591 - New watershed agreements prohibited after July 1, 2008.
90.03.605 - Compliance—Sequence of enforcement measures—Location of compliance personnel.
90.03.615 - Calculating annual consumptive quantity.
90.03.620 - Water rights adjudication—Disqualification of judge.
90.03.625 - Water rights adjudication—Motion for default.
90.03.630 - Water rights adjudication—Use for which a statement of claim is required.
90.03.635 - Water rights adjudication—Filing of evidence.
90.03.640 - Water rights adjudication—Preliminary investigation—Department's report of findings.
90.03.645 - Water rights adjudication—Early settlement encouraged—Approval of settlement.
90.03.650 - Water rights processing account.
90.03.655 - Expedited processing of applications—On department's own volition—Notice—Fees.
90.03.660 - Expedited processing of applications—Notice to tribal governments.
90.03.665 - Certified water right examiners—Fees—Rules.
90.03.670 - Processing of water right applications—Scope of chapter 285, Laws of 2010.