RCW 86.16.180
Processing of permits and authorizations for emergency water withdrawal and facilities to be expedited.
All state and local agencies with authority under this chapter to issue permits or other authorizations in connection with emergency water withdrawals and facilities authorized under RCW 43.83B.410 shall expedite the processing of such permits or authorizations in keeping with the emergency nature of such requests and shall provide a decision to the applicant within fifteen calendar days of the date of application.
[ 1989 c 171 § 9; 1987 c 343 § 7.]
NOTES:
Severability—1989 c 171: See note following RCW 43.83B.400.
Structure Revised Code of Washington
Chapter 86.16 - Floodplain Management.
86.16.010 - Statement of policy—State control assumed.
86.16.020 - Floodplain management regulation.
86.16.025 - Authority of department.
86.16.031 - Duties of the department of ecology.
86.16.035 - Department of ecology—Control of dams and obstructions.
86.16.045 - Adoption of ordinances or requirements that exceed minimum federal requirements.
86.16.051 - Basis for state and local floodplain management.
86.16.061 - Adoption of rules.
86.16.071 - Chapter not to create liability for damages against the state.
86.16.120 - Flood damages defined.
86.16.160 - Local programs not prevented.