RCW 78.44.320
Definitions applicable to RCW 78.44.330.
The definitions in this section apply throughout RCW 78.44.330 unless the context clearly requires otherwise.
(1) "Bedrock sluice" means a wood or metal flume or trough that is permanently attached to the bedrock of the creek and is equipped with transverse riffles across the bottom of the unit and used to recover heavy mineral sands.
(2) "Dredge" means a subsurface hose from one and one-half to ten inches in diameter that is powered by an engine and is used to draw up auriferous material that is then separated in the sluice portion of the unit.
(3) "Flume" means a trough used to convey water.
(4) "Mining claim" means a portion of the public lands claimed for the valuable minerals occurring in those lands and for which the mineral rights are obtained under federal law or a right that is recognized by the United States bureau of land management and given an identification number.
(5) "Quartz mill" means a facility for processing ores or gravel.
(6) "Rocker box" means a unit constructed of a short trough attached to curved supports that allow the unit to be rocked from side to side.
(7) "Sluice box" means a portable unit constructed of a wood or metal flume or trough equipped with transverse riffles across the bottom of the unit and that is used to recover heavy mineral sands.
[ 2003 c 335 § 1.]
Structure Revised Code of Washington
Title 78 - Mines, Minerals, and Petroleum
Chapter 78.44 - Surface Mining.
78.44.010 - Legislative finding.
78.44.040 - Administration of chapter—Rule-making authority.
78.44.045 - Surface mining reclamation account.
78.44.055 - Surface mining of coal—Preemption of chapter by federal laws, programs.
78.44.060 - Investigations, research, etc.—Dissemination of information.
78.44.070 - Cooperation with other agencies—Receipt and expenditure of funds.
78.44.081 - Reclamation permits required—Applications.
78.44.083 - Reclamation permit—Refusal to issue.
78.44.085 - Application fee—Annual permit fee—Confidential records—Appeals—Collection of fees.
78.44.087 - Performance security required—Department authority.
78.44.091 - Reclamation plans—Approval process.
78.44.101 - Joint reclamation plans may be required.
78.44.111 - Segmental reclamation—Primary objective.
78.44.121 - Reclamation setbacks—Exemption.
78.44.141 - Reclamation—Minimum standards—Waiver.
78.44.151 - Reclamation plans—Modification, when required—SEPA.
78.44.171 - Reclamation—Transfer of permits.
78.44.181 - Reclamation—Report by permit holder on anniversary date.
78.44.190 - Deficiencies—Order to rectify—Time extension.
78.44.210 - Suspension of a reclamation permit.
78.44.220 - Declaration of abandonment—Reclamation—Subsequent miner.
78.44.230 - Abandonment—Cancellation of the reclamation permit.
78.44.240 - Reclamation by the department—Order to submit performance security—Cost recovery.
78.44.250 - Fines—Civil penalties—Damage recovery.
78.44.260 - Operating without permit—Penalty.
78.44.280 - Underground operation—Surface disturbances subject to chapter.
78.44.300 - Reclamation awards—Recognition of excellence.
78.44.310 - Reclamation consulting—No cost service.
78.44.320 - Definitions applicable to RCW 78.44.330.
78.44.330 - Mineral trespass—Penalty.
78.44.340 - Mineral trespass—Limitation on application.
78.44.350 - Blanket performance security.
78.44.370 - Notice of correction.
78.44.390 - Cancellation of a reclamation permit.