RCW 70.40.140
Inspection of project under construction—Certification as to federal funds due.
From time to time the secretary shall inspect each construction project approved by the surgeon general, and, if the inspection so warrants, the secretary shall certify to the surgeon general that work has been performed upon the project, or purchases have been made, in accordance with the approved plans and specifications, and that payment of an installment of federal funds is due to the applicant.
[ 1979 c 141 § 105; 1949 c 197 § 14; Rem. Supp. 1949 § 6090-73.]
Structure Revised Code of Washington
Title 70 - Public Health and Safety
Chapter 70.40 - Hospital and Medical Facilities Survey and Construction Act.
70.40.005 - Transfer of duties to the department of health.
70.40.030 - Section of hospital and medical facility survey and construction established—Duties.
70.40.040 - General duties of the secretary.
70.40.060 - Development of program for construction of facilities needed.
70.40.070 - Distribution of facilities.
70.40.080 - Federal funds—Application for—Deposit, use.
70.40.090 - State plan—Publication—Hearing—Approval by surgeon general—Modifications.
70.40.100 - Plan shall provide for construction in order of relative needs.
70.40.110 - Minimum standards for maintenance and operation.
70.40.120 - Applications for construction projects—Diagnostic, treatment centers.
70.40.140 - Inspection of project under construction—Certification as to federal funds due.
70.40.150 - Hospital and medical facility construction fund—Deposits, use.