RCW 64.55.060
Certification—Certificate of occupancy.
Upon completion of an inspection required by this chapter, the qualified inspector shall prepare and submit to the appropriate building department a signed letter certifying that the building enclosure has been inspected during the course of construction or rehabilitative construction and that it has been constructed or reconstructed in substantial compliance with the building enclosure design documents, as updated pursuant to RCW 64.55.020. The building department shall not issue a final certificate of occupancy or other equivalent final acceptance until the letter required by this section has been submitted. The building department is not charged with and has no responsibility for determining whether the building enclosure inspection is adequate or appropriate to satisfy the requirements of this chapter.
[ 2005 c 456 § 7.]
Structure Revised Code of Washington
Title 64 - Real Property and Conveyances
Chapter 64.55 - Construction Defect Disputes—Multiunit Residential Buildings.
64.55.020 - Building permit application—Submission of design documents.
64.55.030 - Inspection required.
64.55.040 - Inspectors—Qualifications.
64.55.050 - Scope of inspection—Definition.
64.55.060 - Certification—Certificate of occupancy.
64.55.080 - Inspector's report or testimony—No evidentiary presumption—Admissibility.
64.55.090 - Sale of condominium unit subject to compliance—Inspection alternative.
64.55.100 - Arbitration—Election—Number of arbitrators—Qualifications—Trial de novo.
64.55.110 - Case schedule plan—Deadlines.
64.55.120 - Mandatory mediation.
64.55.140 - Payment of arbitrators, mediators, and neutral experts.
64.55.150 - Subcontractors and suppliers—When party to arbitration.