RCW 64.04.170
Interference with solar easement—Remedies.
In any action for interference with a solar easement, if the instrument creating the easement does not specify any appropriate and applicable remedies, the court may choose one or more remedies including but not limited to the following:
(1) Actual damages as measured by increased charges for supplemental energy, the capital cost of the solar energy system, and/or the cost of additional equipment necessary to supply sufficient energy:
(a) From the time the interference began until the actual or expected cessation of the interference; or
(b) If the interference is not expected to cease, in a lump sum which represents the present value of the damages from the time the interference began until the normally expected end of the useful life of the equipment which was interfered with;
(2) Reasonable and necessary attorney's fees as fixed by the court; and
(3) An injunction against the interference.
[ 1979 ex.s. c 170 § 13.]
NOTES:
Severability—1979 ex.s. c 170: See note following RCW 64.04.140.
Structure Revised Code of Washington
Title 64 - Real Property and Conveyances
64.04.005 - Liquidated damages—Earnest money deposit—Exclusive remedy—Definition.
64.04.010 - Conveyances and encumbrances to be by deed.
64.04.020 - Requisites of a deed.
64.04.030 - Warranty deed—Form and effect.
64.04.040 - Bargain and sale deed—Form and effect.
64.04.050 - Quitclaim deed—Form and effect.
64.04.055 - Deeds for conveyance of apartments under horizontal property regimes act.
64.04.060 - Word "heirs" unnecessary.
64.04.070 - After acquired title follows deed.
64.04.090 - Private seals abolished.
64.04.100 - Private seals abolished—Validation.
64.04.105 - Corporate seals—Effect of absence from instrument.
64.04.140 - Legislative declaration—Solar energy systems—Solar easements authorized.
64.04.150 - Solar easements—Definitions.
64.04.160 - Solar easements—Creation.
64.04.170 - Interference with solar easement—Remedies.
64.04.175 - Easements established by dedication—Extinguishing or altering.
64.04.190 - Public utility and transportation corridors—Defined.
64.04.200 - Existing rate or charge for energy conservation—Seller's duty to disclose.