Revised Code of Washington
Chapter 47.60 - Puget Sound Ferry and Toll Bridge System.
47.60.814 - Design-build ferries—Issuance of request for proposals.

RCW 47.60.814
Design-build ferries—Issuance of request for proposals.

(1) Subject to legislative appropriation for the procurement of vessels, the department shall issue a request for proposals to interested parties that must include, at least, the following:
(a) Solicitation of a proposal to participate in a design and build partnership with the department to design and construct the auto ferries;
(b) Instructions on the prequalification process and procedures;
(c) A description of the modified request for proposals process. Under this process, the department may modify any component of the request for proposals, including the outline specifications, by addendum at any time before the submittal of bids in phase three;
(d) A description of the design and build partnership process to be used for procurement of the vessels;
(e) Outline specifications that provide the requirements for the vessels including, but not limited to, items such as length, beam, displacement, speed, propulsion requirements, capacities for autos and passengers, passenger space characteristics, and crew size. The department will produce notional line drawings depicting hull geometry that will interface with Washington state ferries terminal facilities. Notional lines may be modified in phase two, subject to approval by the department;
(f) Instructions for the development of technical proposals in phase two, and information regarding confidentiality of technical proposals;
(g) The vessel delivery schedule, identification of the port on Puget Sound where delivery must take place, and the location where acceptance trials must be held;
(h) The estimated price range for the contract;
(i) Notification that the contract will be a fixed price contract;
(j) The form and amount of the required bid deposit and contract security;
(k) A copy of the contract that will be signed by the successful proposer;
(l) The date by which proposals in phase one must be received by the department in order to be considered;
(m) A description of information to be submitted in the proposals in phase one concerning each proposer's qualifications, capabilities, and experience;
(n) A statement of the maximum number of proposers that may be selected in phase one for development of technical proposals in phase two;
(o) Criteria that will be used for the phase one selection of proposers to participate in the phase two development of technical proposals;
(p) A description of the process that will be used for the phase three submittal and evaluation of bids, award of the contract, and postaward administrative activities;
(q) A requirement that the contractor comply with all applicable laws, rules, and regulations including but not limited to those pertaining to the environment, worker health and safety, and prevailing wages;
(r) A requirement that the vessels be constructed within the boundaries of the state of Washington except that equipment furnished by the state and components, products, and systems that are standard manufactured items are not subject to the in-state requirement under this subsection (1)(r). For the purposes of this subsection (1)(r), "constructed" means the fabrication, by the joining together by welding or fastening of all steel parts from which the total vessel is constructed, including, but not limited to, all shell frames, longitudinals, bulkheads, webs, piping runs, wire ways, and ducting. "Constructed" also means the installation of all components and systems, including, but not limited to, equipment and machinery, castings, electrical, electronics, deck covering, lining, paint, and joiner work required by the contract. "Constructed" also means the interconnection of all equipment, machinery, and services, such as piping, wiring, and ducting;
(s) A requirement that all vessel design specifications and drawings must be complete and, when applicable, meet United States coast guard standards before vessel construction begins; and
(t) A requirement that all warranty work on the vessel must be performed within the boundaries of the state of Washington, insofar as practical.
(2) The department shall not issue a request for proposals for the procurement of vessels, except on a contract executed before July 6, 2015, without specific authorization to do so from the legislature. After receiving such specific authorization, any request for proposals issued by the department must comply with RCW 47.60.815.

[ 2015 3rd sp.s. c 14 § 4; 2001 c 226 § 6.]
NOTES:

Effective date—2015 3rd sp.s. c 14: See note following RCW 47.60.005.


Findings—Purpose—2001 c 226: See note following RCW 47.20.780.

Structure Revised Code of Washington

Revised Code of Washington

Title 47 - Public Highways and Transportation

Chapter 47.60 - Puget Sound Ferry and Toll Bridge System.

47.60.005 - Definitions.

47.60.010 - Ferry system, toll bridges, and facilities authorized—Power to contract, sell, and lease back.

47.60.013 - Emergency powers of governor to insure continued operation of ferry and toll bridge system—Cost reimbursement.

47.60.015 - "Washington State Ferries"—Name authorized.

47.60.017 - State ferry system a public mass transportation system.

47.60.020 - Eminent domain—Condemnation proceedings.

47.60.030 - Existing contracts—Prior negotiations and bids validated.

47.60.040 - Survey by department.

47.60.050 - Improvement of facilities—Financing.

47.60.060 - Revenue bonds authorized—Issuance—Conditions—Negotiability—Interim bonds.

47.60.080 - Determining amount of bonds to be issued.

47.60.090 - Sale of bonds—Deposit, disbursement of proceeds.

47.60.100 - Bonds are legal investment for state moneys.

47.60.110 - Bondholders may compel performance.

47.60.113 - Refunding bonds—Authorization—Amount—Interest—Conditions.

47.60.114 - Refunding bonds—Payable from revenues.

47.60.115 - Refunding bonds—Disposition—Laws applicable.

47.60.120 - Other crossings—Infringement of existing franchises—Waivers (as amended by 2003 c 83).

47.60.122 - Ferries, terminal facilities—Interim revenue warrants authorized.

47.60.124 - Revenue refunding bonds to redeem interim warrants.

47.60.126 - Interim warrants and refunding bonds—Laws applicable.

47.60.130 - Unit or combined operation—Continuous project—Rental, charter, lease of system property—Sale of unneeded property.

47.60.135 - Charter of state ferries—Hazardous materials.

47.60.140 - System as self-liquidating undertaking—Powers of department—Concessions.

47.60.145 - Historic ferries—Acquisition by qualified persons or organizations.

47.60.170 - Ferries revolving fund—Deposit of excess funds.

47.60.200 - Consent to liability not general liability of state.

47.60.210 - Seamen may sue for injuries—Venue.

47.60.220 - Department as common carrier—Rights and liabilities.

47.60.230 - Liability for damages as to persons or property.

47.60.240 - Liability to persons other than shippers or passengers—Limitation.

47.60.250 - Claim for damages—Filing—Contents—Time limitations.

47.60.260 - Payment of claims.

47.60.270 - Venue of actions—Enforcement of judgment.

47.60.275 - Local law enforcement officers on ferries and terminals.

47.60.280 - Ferry service—Lummi Island to Orcas Island—Limitation on operation.

47.60.282 - Ferry service between Port Townsend and Keystone—Operation authorized, when.

47.60.283 - Ferry service between Port Townsend and Keystone—Purpose.

47.60.286 - Ferry user data survey.

47.60.290 - State ferries—Review of fares and pricing policies—Proposals.

47.60.300 - State ferries—Scope of review—Periodic reviews required.

47.60.310 - State ferries—Local expressions—Ferry advisory committees.

47.60.315 - Fares and pricing policies—Adoption schedule—Revenues—Vessel replacement surcharges.

47.60.322 - Capital vessel replacement account—Transfer prohibition, authorization.

47.60.327 - Operational strategies for asset utilization.

47.60.330 - Public participation—Legislative approval.

47.60.335 - Appropriation limitations—Capital program cost allocation.

47.60.340 - Vessel maintenance and preservation program—Report.

47.60.345 - Life-cycle cost model on capital assets.

47.60.355 - Terminal and vessel preservation funding requests—Predesign study.

47.60.365 - Terminal and vessel design standards.

47.60.375 - Capital plan.

47.60.377 - Vessel rebuild and replacement plan.

47.60.385 - Terminal improvement, vessel improvement, and vessel acquisition project funding requests—Predesign study—Prioritization.

47.60.386 - Additional requirements for vessel improvement and vessel acquisition funding requests.

47.60.400 - Refunding bonds authorized, 1961 Act.

47.60.420 - Additional revenue bonds, refunding bonds, authorized, 1961 Act—Prior charge against Puget Sound capital construction account if ferry system revenues insufficient.

47.60.430 - Additional revenue bonds, refunding bonds, authorized, 1961 Act—Agreement to continue imposition of certain taxes.

47.60.440 - Additional revenue bonds, refunding bonds, authorized, 1961 Act—Ferry system a revenue-producing undertaking—Debt service—Tolls on ferry system and Hood Canal bridge.

47.60.500 - Acquisition of additional ferries—Legislative finding—Department authority.

47.60.505 - Puget Sound capital construction account—Created—Use.

47.60.530 - Puget Sound ferry operations account.

47.60.550 - Parking or holding area for ferry patrons in conjunction with municipal off-street parking facilities.

47.60.560 - General obligation bonds—Ferries—Authorized—Purposes—Passenger-only vessels—Issuance, sale, and retirement.

47.60.570 - Disposition of proceeds from sale of bonds.

47.60.580 - Bonds—Terms—Principal and interest payable from proceeds of state excise taxes on motor vehicle and special fuels.

47.60.590 - Repayment of bonds—Fund sources.

47.60.600 - Bonds—Powers and duties of state finance committee.

47.60.610 - Excess repayment funds—Disposition.

47.60.620 - Reimbursements and transfers of funds.

47.60.630 - Bonds legal investment for public funds.

47.60.640 - Bonds—Equal charge against revenues from motor vehicle and special fuel excise taxes.

47.60.656 - Passenger-only ferry service—Conveyance of vessels authorized.

47.60.662 - Ferry system collaboration with passenger-only ferry service providers.

47.60.680 - Prequalification of contractors required.

47.60.690 - Qualifications of contractor—Rules to assure.

47.60.700 - Application for prequalification—Form.

47.60.710 - Department authority to obtain information.

47.60.720 - Additional investigation—Terms of prequalification—Notice of nonqualification.

47.60.730 - Renewal of prequalification—Nonrenewal or revocation, notice.

47.60.740 - Rejection of bid despite prequalification—Unqualified bidder.

47.60.750 - Appeal of refusal, modification, or revocation of prequalification.

47.60.760 - Financial information regarding qualifying not public.

47.60.800 - General obligation bonds—1992 issue—Purpose—Issuance and sale.

47.60.802 - Bonds—1992 issue—Supervision of sale by state finance committee—Option of short-term obligations.

47.60.804 - Bonds—1992 issue—Use of proceeds.

47.60.806 - Bonds—1992 issue—Payment of principal and interest from pledged excise taxes.

47.60.808 - Bonds—1992 issue—Payment from ferry bond retirement fund.

47.60.810 - Design-build ferries—Independent owner's representative—Phases defined—Department may modify certain existing option contracts.

47.60.812 - Design-build ferries—Notice of request for proposals.

47.60.814 - Design-build ferries—Issuance of request for proposals.

47.60.815 - Design-build ferries—Cost-benefit analysis—Engineer's estimate—Subsequent request for proposals, when required.

47.60.816 - Design-build ferries—Phase one.

47.60.818 - Design-build ferries—Phase two.

47.60.820 - Design-build ferries—Phase three.

47.60.822 - Design-build ferries—Notice to proposers not selected—Appeal.

47.60.824 - Design-build ferries—Single best-qualified proposer—Incentives—Proposal negotiations—Compensation.

47.60.8241 - Findings—Single proposal process for new ferry vessel construction.

47.60.830 - Ferry system operation—Fuel purchasing strategies—Report.

47.60.835 - Small business enterprise enforceable goals program.

47.60.838 - Vessel and terminal electrification program.

47.60.840 - Annual fare policy.