RCW 36.86.090
Logs dumped on right-of-way—Removal—Confiscation.
Logs dumped on any county road right-of-way or in any county road drainage ditch due to hauling equipment failure, or for any other reason, shall be removed within ten days. Logs remaining within any county road right-of-way for a period of thirty days shall be confiscated and removed or disposed of as directed by the boards of county commissioners in the respective counties. Confiscated logs may be sold by the county commissioners and the proceeds thereof shall be deposited in the county road fund.
[ 1963 c 4 § 36.86.090. Prior: 1951 c 143 § 1.]
Structure Revised Code of Washington
Chapter 36.86 - Roads and Bridges—Standards.
36.86.010 - Standard width of right-of-way prescribed.
36.86.020 - Minimum standards of construction.
36.86.030 - Amendment of standards—Filing.
36.86.040 - Uniform standard for signs, signals, guideposts—Railroad grade crossings.
36.86.050 - Monuments at government survey corners.
36.86.060 - Restrictions on use of oil at intersections or entrances to county roads.
36.86.080 - Application of design standards to construction and reconstruction.
36.86.090 - Logs dumped on right-of-way—Removal—Confiscation.