Effective: June 30, 2021
Latest Legislation: House Bill 74 - 134th General Assembly
(A) The county engineer may, when authorized by the board of county commissioners and not required by this section or other law to use competitive bidding, employ such laborers and vehicles, use such county employees and property, lease such implements and tools, and purchase such materials as are necessary in the construction, reconstruction, improvement, maintenance, or repair of roads by force account.
In determining whether construction or reconstruction, including widening and resurfacing, of roads may be undertaken by force account, the county engineer shall first cause to be made an estimate of the cost of such work using the force account project assessment form developed by the auditor of state under section 117.16 of the Revised Code. When the total estimated cost of the work exceeds thirty thousand dollars per mile, the county commissioners shall invite and receive competitive bids for furnishing all the labor, materials, and equipment necessary to complete the work in accordance with sections 307.86 to 307.92 of the Revised Code.
(B) The county engineer may, when authorized by the board of county commissioners and not required by this section or other law to use competitive bidding, employ such laborers and vehicles, use such county employees and property, lease such implements and tools, and purchase such materials as are necessary in the construction, reconstruction, improvement, maintenance, or repair of bridges and culverts by force account.
In determining whether such construction, reconstruction, improvement, maintenance, or repair of bridges or culverts may be undertaken by force account, the county engineer shall first cause to be made an estimate of the cost of such work using the force account project assessment form. When the total estimated cost of the work exceeds one hundred thousand dollars, the board of county commissioners shall invite and receive competitive bids for furnishing all the labor, materials, and equipment necessary to complete the work, in accordance with sections 307.86 to 307.92 of the Revised Code. The county engineer shall obtain the approval required by section 5543.02 of the Revised Code.
(C) On the first day of July of every odd-numbered year beginning in 2021, the threshold amounts established in this section shall increase by an amount not to exceed the lesser of three per cent, or the percentage amount of any increase in the department of transportation's construction cost index as annualized and totaled for the prior two calendar years. The director of transportation shall notify each appropriate county engineer of the increased amount.
(D) "Force account," as used in this section means that the county engineer will act as contractor, using labor employed by the engineer using material and equipment either owned by the county or leased or purchased in compliance with sections 307.86 to 307.92 of the Revised Code and excludes subcontracting any part of such work unless done pursuant to sections 307.86 to 307.92 of the Revised Code.
The term "competitive bids" as used in this section requires competition for the whole contract and in regard to its component parts, including labor and materials. Neither plans nor specifications shall be drawn to favor any manufacturer or bidder unless required by the public interest.
Last updated April 12, 2021 at 10:16 AM
Structure Ohio Revised Code
Title 55 | Roads-Highways-Bridges
Chapter 5543 | Duties of County Engineer
Section 5543.01 | General Powers and Duties of County Engineer.
Section 5543.011 | Fuel Sales to County Board of Developmental Disabilities.
Section 5543.02 | Annual Report.
Section 5543.03 | Report to Director of Transportation.
Section 5543.04 | Naming and Numbering Roads and Bridges - Maps.
Section 5543.05 | County Engineer to Assign Expense of Road or Bridge.
Section 5543.06 | Annual Meeting of County and Township Authorities.
Section 5543.08 | Assistance of Director of Transportation.
Section 5543.09 | Supervision by County Engineer.
Section 5543.10 | Constructing Sidewalks, Curbs, or Gutters.
Section 5543.11 | Grade and Width of Sidewalks - Permission for Construction.
Section 5543.12 | County Engineer Right of Entry.
Section 5543.13 | Agreement as to Compensation and Damages.
Section 5543.14 | County Engineer to Trim or Remove Vegetation Along Roads.
Section 5543.16 | Construction and Repair of Approaches and Driveways - Cost.
Section 5543.17 | Avoiding Closing to Traffic at Any One Time Entire Width of Highway or Bridge.
Section 5543.18 | Erection of Signposts.
Section 5543.19 | Construction or Reconstruction by Force Account.
Section 5543.20 | Responsibility for Bridge Inspection.