130A-338. Authorization for wastewater system construction required before other permits to be issued.
Where construction, location or relocation is proposed to be done upon a residence, place of business or place of public assembly, no permit required for electrical, plumbing, heating, air conditioning or other construction, location or relocation activity under any provision of general or special law shall be issued until an authorization for wastewater system construction has been issued under G.S. 130A-336, or authorization has been obtained under G.S. 130A-337(c), or a decision on the completeness of the notice of intent to construct is made by the local health department pursuant to G.S. 130A-336.1(c). (1973, c. 452, s. 7; 1981, c. 949, s. 3; 1983, c. 891, s. 2; 1995, c. 285, s. 1; 2015-286, s. 4.14(d).)
Structure North Carolina General Statutes
North Carolina General Statutes
Article 11 - Wastewater Systems.
§ 130A-335 - Wastewater collection, treatment and disposal; rules.
§ 130A-335.1 - Effluent filters and access devices for certain septic tank systems.
§ 130A-336 - Improvement permit and construction authorization required.
§ 130A-336.1 - Alternative process for wastewater system approvals.
§ 130A-336.2 - Alternative wastewater system approvals for nonengineered systems.
§ 130A-337 - Inspection; operation permit required.
§ 130A-338 - Construction authorization required before other permits to be issued.
§ 130A-339 - Limitation on electrical service.
§ 130A-340 - Review procedures and appeals.
§ 130A-341 - Consideration of a site with existing fill.
§ 130A-342 - Residential wastewater treatment systems.
§ 130A-343 - Approval of on-site subsurface wastewater systems.
§ 130A-345 - Disposal of liquid condensate from residential heating and cooling systems.