85-1-501. Survey of power generation capacity. (1) The department shall study the economic and environmental feasibility of constructing and operating a small-scale hydroelectric power generating facility on each of the water projects under its control and shall periodically update those studies as the cost of the electrical energy increases. In determining whether small-scale hydroelectric generation may be economically feasible on a particular project, the department shall consider:
(a) the estimated cost of construction of a facility;
(b) the estimated cost of maintaining, repairing, and operating the facility;
(c) the estimated cost of tying into an existing power distribution channel;
(d) the ability of public utilities or rural electric cooperatives to lease and operate such a facility;
(e) the debt burden to be serviced;
(f) the revenue expected to be derived;
(g) the likelihood of a reasonable rate of return on the investment; and
(h) the potential impacts on water supply and streamflows.
(2) The department shall update the energy and telecommunications interim committee and the water policy interim committee in accordance with 5-11-210 on all past and current studies conducted pursuant to this section.
History: En. Sec. 1, Ch. 503, L. 1981; amd. Sec. 1, Ch. 275, L. 2011; amd. Sec. 114, Ch. 261, L. 2021.
Structure Montana Code Annotated
Part 5. Power Generation at Projects
85-1-501. Survey of power generation capacity
85-1-502. Notice of availability of lease sites
85-1-503. Receipt of applications
85-1-504. Determinations by department
85-1-506. Compliance with federal law
85-1-508. Duties of the department
85-1-509. Power generation by department authorized
85-1-510. Sale of power and allocation of revenue
85-1-511. Determination by the public service commission