Sec. 31505.
(1) "Removal" means the physical elimination of a dam or impoundment.
(2) "Repair" means to substantially restore a dam to its original condition and includes only such restoration as may directly affect the structural integrity of the dam.
(3) "Riparian owner" means a person who has riparian rights.
(4) "Riparian rights" means rights which accrue by operation of law to a landowner on the banks of an inland lake or stream.
(5) "Significant hazard potential dam" means a dam located in an area where its failure may cause damage limited to isolated inhabited homes, agricultural buildings, structures, secondary highways, short line railroads, or public utilities, where environmental degradation may be significant, or where danger to individuals exists.
(6) "Spillway" means a waterway in or about a dam designed for the discharge of water.
(7) "Spillway capacity" means the maximum rate of discharge that will pass through a spillway at design flood elevation.
(8) "Two-hundred year flood" means a flood that has a 0.5% chance of being equaled or exceeded in any given year.
History: Add. 1995, Act 59, Imd. Eff. May 24, 1995 Popular Name: Act 451Popular Name: NREPA
Structure Michigan Compiled Laws
Chapter 324 - Natural Resources and Environmental Protection
Act 451 of 1994 - Natural Resources and Environmental Protection Act (324.101 - 324.90106)
Article III - Natural Resources Management (324.30101...324.83109)
451-1994-III-1 - Chapter 1 Habitat Protection (324.30101...324.36507)
451-1994-III-1-INLAND-WATERS - Inland Waters (324.30101...324.31713)
451-1994-III-1-INLAND-WATERS-315 - Part 315 Dam Safety (324.31501...324.31529)
Section 324.31501 - Meanings of Words and Phrases.
Section 324.31502 - Definitions; a to D.
Section 324.31503 - Definitions; E to H.
Section 324.31504 - Definitions; I to P.
Section 324.31505 - Definitions; R to T.
Section 324.31506 - Jurisdiction of Dams and Impoundments; Exemptions.
Section 324.31507 - Prohibited Conduct; Exception.
Section 324.31511 - Copies of Application and Statement; Submission; Public Hearing; Notice.
Section 324.31513 - Minor Project Categories; Rules.
Section 324.31519 - Order to Limit Dam Operations; Order to Remove Dam; Hearing.
Section 324.31521 - Emergency Orders.
Section 324.31522 - Structural Integrity and Operation of Dam; Investigations and Studies.
Section 324.31527 - Entering Private or Public Property; Time; Purpose.