Sec. 2b.
(1) Based upon the most precise approach available or planned for either end of a runway, the width of the primary surface is 1 of the following:
(a) For a runway with a prepared hard surface or for which there are plans for a prepared hard surface, the length of the runway plus 200 feet beyond each end of the runway.
(b) For a runway other than a runway described in subdivision (a), the length of the runway.
(3) The elevation of a point on a primary surface is the same as the elevation of the point on the runway's centerline nearest to the point on the primary surface.
History: Add. 1986, Act 296, Eff. Apr. 1, 1987
Structure Michigan Compiled Laws
Act 259 of 1959 - Tall Structure Act (259.481 - 259.493)
Section 259.481 - Definitions.
Section 259.482 - Permit Required for Construction of Certain Structures.
Section 259.482b - Width of Primary Surface; Length of Primary Surface; Elevation.
Section 259.482c - Width of Approach Surface; Outward and Upward Extension of Approach Surface.
Section 259.482d - Extension of Transitional Surface.
Section 259.482e - Perimeter of Horizontal Surface.
Section 259.483 - Building Permits; Public Utility Structures, Emergency Repair.
Section 259.490 - Action to Enjoin, Restrain, Correct, or Abate Violation.
Section 259.491 - Rules; Forms.