(a) All engineering documents prepared in connection with the alteration, construction, design, or repair of a building, structure, building engineering system and its components, machine, equipment, process, works, subsystem, project, public or private utility, or facility in the built or economic environment, including an engineering document prepared at the request of the State or a political subdivision of the State, where the skills of a professional engineer are required, shall be signed, sealed, and dated by the professional engineer who prepared or approved the documents.
(b) A professional engineer may perform design coordination for a project or portion of a project provided that the professional engineer:
(1) holds a current license issued by the Board; and
(2) has adequate experience in, and understanding of, achieving the purpose of the project or portion of the project being coordinated.