Maine Revised Statutes
Subchapter 3: HAZARDOUS MATTER CONTROL
38 §1318-C. Spill prevention control and clean-up plan

§1318-C. Spill prevention control and clean-up plan
A responsible party may develop and submit to the commissioner spill prevention, control and clean-up plans referred to in this section as "the plan" to address discharges of hazardous matter.   [PL 1991, c. 208, §3 (NEW).]
1.  Plan content.  Spill prevention control and clean-up plans must include at a minimum the following information:  
A. The hazardous matter and substances covered including the reportable quantity for each hazardous matter and mixture measured in pounds if a solid and in pounds and gallons if a liquid;   [PL 1993, c. 355, §53 (AMD).]
B. Any containment and diversionary structures or equipment where appropriate;   [PL 1991, c. 208, §3 (NEW).]
C. Inspection, maintenance and testing procedures for storage and containment areas;   [PL 1991, c. 208, §3 (NEW).]
D. A list of emergency response equipment and locations and a description of the capabilities of the equipment;   [PL 1991, c. 208, §3 (NEW).]
E. A description of employee training programs;   [PL 1991, c. 208, §3 (NEW).]
F. A description of areas in need of protection and method of protection;   [PL 1991, c. 208, §3 (NEW).]
G. A description of discharge detection devices and emergency warning systems;   [PL 1991, c. 208, §3 (NEW).]
H. A list of on-site emergency coordinators and the qualifications of on-site trained employee responders;   [PL 1991, c. 208, §3 (NEW).]
I. A description of evacuation procedures and assembly points;   [PL 1991, c. 208, §3 (NEW).]
J. Notification procedures for federal, state and local officials;   [PL 1991, c. 208, §3 (NEW).]
K. Procedures for supplying written reports to the department;   [PL 1991, c. 208, §3 (NEW).]
L. General response and clean-up protocols by substance or substance class;   [PL 1991, c. 208, §3 (NEW).]
M. Specific on-site containment, treatment or removal plans;   [PL 1991, c. 208, §3 (NEW).]
N. A description of the record-keeping process for responses involving the implementation of this plan;   [PL 1991, c. 208, §3 (NEW).]
O. A description and copies of mutual aid agreements and any agreements with clean-up contractors; and   [PL 1991, c. 208, §3 (NEW).]
P. A promulgation statement and date of plan adoption.   [PL 1991, c. 208, §3 (NEW).]
[PL 1993, c. 355, §53 (AMD).]
2.  Submission.  The plan and all amendments to the plan must be submitted to the commissioner upon adoption or amendment.  
[PL 1991, c. 208, §3 (NEW).]
3.  Amendments.  The plan must be amended as necessary to reflect current conditions at the facility or as determined appropriate by the facility or state agencies.  
[PL 1991, c. 208, §3 (NEW).]
SECTION HISTORY
PL 1991, c. 208, §3 (NEW). PL 1993, c. 355, §53 (AMD).