Kansas Statutes
Article 7 - Appropriation Of Water For Beneficial Use
82a-734 Sand and gravel pits; beneficial use of water, when; permit; application; fee; perfection of appropriation; examination of diversion works; assessment of water protection fee.

82a-734. Sand and gravel pits; beneficial use of water, when; permit; application; fee; perfection of appropriation; examination of diversion works; assessment of water protection fee. (a) An operator shall notify the chief engineer of the location and area extent of any existing or proposed sand and gravel pit to be excavated, expanded or operated by the operator.
(b) The net evaporation of water exposed as the result of the opening or operation of sand and gravel pits shall be construed to be a beneficial use or diversion of water for the purposes of the Kansas water appropriation act, K.S.A. 82a-701 et seq., and amendments thereto, if the sand and gravel pit is opened or operated in a township where the average annual potential net evaporation is greater than 18 inches per year, as determined by the chief engineer.
(c) If the chief engineer determines that an existing or proposed sand and gravel pit operation is a beneficial use of water, the operator shall apply to the chief engineer for a permit to appropriate water in accordance with the Kansas water appropriation act or otherwise acquire ownership or control of sufficient water rights, or by other methods pursuant to rules and regulations adopted by the chief engineer, or both, to offset net evaporation for the operation. The chief engineer may reduce this required offset based on the estimated use of groundwater by the existing vegetation.
(d) (1) The permit shall authorize net evaporation as the primary use, and hydraulic dredging and sand washing as secondary uses of water if such secondary uses are located within the same source of supply and are associated with the operation. Any secondary uses shall use water in a manner in which there is no significant net consumptive use. The permit shall not be subject to the installation of a water flow meter or administration of minimum desirable stream flow. Where the average potential net evaporation is less than 18 inches per year as determined by the chief engineer, the chief engineer shall issue a single term permit for the life of the project, not to exceed 80 years, for such secondary uses.
(2) The secondary uses shall be granted for the proposed life of the project or until the exhaustion of sand and gravel reserves. At the end of the industrial project, the owner shall file an application authorized by K.S.A. 82a-708b, and amendments thereto, to change the primary use made of water to recreational use to authorize the net evaporation use caused by the exposed groundwater.
(3) If a permit is denied, the chief engineer shall set forth all reasons for such denial.
(4) Any applicant who is denied a project permit by a final order of the chief engineer under this section may appeal such order in the manner provided by the Kansas judicial review act.
(5) Any application for a project permit shall be accompanied by a filing fee of $500 and any request for modification shall be accompanied by a fee of $250. Applicants for a project permit under this section shall not be required to pay fees pursuant to K.S.A. 82a-708a and 82a-708c, and amendments thereto, as part of such application.
(e) (1) The initial period of time allowed to complete construction of diversion works pursuant to an approved application to appropriate water for the purpose of net evaporation from a sand and gravel pit operation shall be reasonable and consistent with the proposed use. The chief engineer may allow extension of such period by not to exceed two 10-year extensions if it can be shown that the operation requires the additional time for the operator to satisfy the operator's market demand in the area. The two 10-year extensions may be granted at the same time, to run consecutively, if the applicant submits to the chief engineer a written development plan.
(2) The period of time allowed to perfect an approved application to appropriate water for the purpose of net evaporation from a sand and gravel pit operation shall be not less than 20 years and, for good cause shown, the chief engineer may allow one or more 10-year extensions of such period. The chief engineer shall consider the time needed until exhaustion of proven reserves, closure in accordance with the surface land reclamation and mining act, K.S.A. 49-601 et seq., and amendments thereto, and the availability of water for the proposed use, but in no case shall allow longer than 80 years for perfection.
(3) Nothing herein shall require an extension of time to construct diversion works or to perfect a water right if there is demonstrable impairment of a use under an existing water right from the same source of supply, as determined pursuant to K.S.A. 82a-711, and amendments thereto.
(4) Upon examination of the diversion works for sand and gravel operations, the chief engineer or the chief engineer's duly authorized representative shall, within 90 days of the examination, notify the applicant if there was a failure to construct the diversion works at the authorized location or any deficiency of the terms and conditions of the permit. This notice will provide steps necessary to gain compliance with state law. If the chief engineer fails to examine the diversion works within two years of the notice of completion for any sand and gravel operation diversion works, the applicant shall not be required to forfeit priority date as a result of failure to construct a diversion works at the authorized location or any deficiency of the terms and conditions of the permit.
(f) Net evaporation from sand and gravel pits, as calculated by the chief engineer, will be reported as an industrial use to the director of taxation for the purpose of assessing the water protection fee pursuant to K.S.A. 82a-954, and amendments thereto.
(g) This section shall be part of and supplemental to the Kansas water appropriations act.
History: L. 1995, ch. 72, § 1; L. 2004, ch. 100, § 1; L. 2006, ch. 72, § 1; L. 2012, ch. 133, § 2; L. 2013, ch. 111, § 3; July 1.

Structure Kansas Statutes

Kansas Statutes

Chapter 82a - Waters And Watercourses

Article 7 - Appropriation Of Water For Beneficial Use

82a-701 Definitions.

82a-702 Dedication of use of water.

82a-703 Water may be appropriated subject to vested rights.

82a-703a Minimum streamflows; duties of chief engineer.

82a-703b Minimum desirable streamflows; condition of appropriation right, applicability.

82a-703c Minimum streamflows established.

82a-704a Determination of vested rights; procedure; duties of chief engineer.

82a-704b Same; notice.

82a-704c Same; supplemental to Kansas water appropriation act.

82a-705 Acquisition of a new appropriation right to use water other than domestic; approval.

82a-705a Domestic use after June 28, 1945; information to chief engineer.

82a-706 Duties of chief engineer as to beneficial use and rights of priority of appropriation.

82a-706a Rules, regulations and standards.

82a-706b Diversion of water prohibited, when; unlawful acts; enforcement and augmentation by chief engineer.

82a-706c Meters, gages and other measuring devices; waste and quality checks.

82a-706d Duties of attorney general.

82a-706e State field offices and commissioners.

82a-707 Principles governing appropriations; priorities.

82a-708a Applications for permits to appropriate water; fee.

82a-708b Application for change in place of use, point of diversion or use; fee; review of action on application.

82a-708c Application for term permits to appropriate water; fee.

82a-709 Same; contents; time of filing.

82a-710 Same; return for correction or completion; maps, plats, plans and drawings; default in refiling.

82a-711 Permits to appropriate water; standards for approval of use; review of action on application.

82a-711a Same; express conditions of appropriations.

82a-712 Same; notice of approval or disapproval of application; approval constitutes permit.

82a-713 Same; limiting time for perfection of appropriation; extension.

82a-714 Same; completion of works; extension of time; certificate of appropriation; fees.

82a-715 Same; validation of certain applications.

82a-716 Common-law claimants; action for compensation; injunctions.

82a-717a Diversions by common-law claimants and others; complaints, investigations and orders.

82a-718 Abandonment of water rights; notices; hearing; review of action; exceptions.

82a-719 Distribution of water according to decree of court.

82a-720 Same; certified copies of decrees.

82a-721 Construction of act.

82a-721a Same; damages to land.

82a-722 Invalidity of part.

82a-724 Review of administrative actions.

82a-725 Same; reference to state division or its chief engineer; procedures; cases in federal courts.

82a-726 Diversion and transportation of water for use in another state; approval by chief engineer; conditions.

82a-727 Temporary permits to appropriate water; extension; fee; rules and regulations.

82a-728 Unlawful acts; penalties.

82a-729 Act supplemental to article 7 of chapter 82a of the Kansas Statutes Annotated.

82a-730 Citation of act.

82a-731 Water appropriation certification fund created; expenditures therefrom.

82a-732 Annual water use report required; penalty for violations.

82a-733 Conservation plans and practices.

82a-734 Sand and gravel pits; beneficial use of water, when; permit; application; fee; perfection of appropriation; examination of diversion works; assessment of water protection fee.

82a-734a Sand and gravel pits, land-based; prohibition on certain rules and regulations, conditions.

82a-736 Multi-year flex accounts; definitions; establishment; conditions; term permits; fees.

82a-737 Civil enforcement of act.

82a-738 Studies and recommendations of chief engineer and state geological survey; report.

82a-739 Installation of water flow measurement and data recording devices below Cedar Bluff reservoir; authorization of property owners; dissemination of data and report to legislative committees.

82a-741 Water conservation program; enrollment; application; fees; administration; rules and regulations.

82a-742 Division of a water right; application; fee.

82a-743 Limited transfer permits; term; fee; base water right; rules and regulations.

82a-744 Water management and conservation measures; due consideration by chief engineer.

82a-745 Water conservation areas; establishment procedures; duties of chief engineer; notice; orders; consent agreement; review; flexibility; impairment.

82a-761 Title; implementation.

82a-762 Definitions.

82a-763 Water bank authority; deposits and leases; safe deposit accounts; restrictions.

82a-764 Bankable water right, determination of.

82a-765 Water bank charter; approval; requirements.

82a-766 Water bank annual reports.

82a-767 Evaluation of water bank; evaluation team; extension or lapse of charter; charter review.

82a-768 Application of law relating to abandonment of water right.

82a-769 Rules and regulations.

82a-770 Enforcement of act.

82a-771 Payment of certain costs of water bank.

82a-772 Water resources cost fund.

82a-773 Water office cost fund.