Sec. 11. (a) The board:
(1) shall review each application;
(2) may verify the contents of an application; and
(3) may visit the trail site that is the subject of an application.
(b) The board shall evaluate each complete application on the basis of the following criteria:
(1) Whether the predicted use of the trail justifies the construction and maintenance costs.
(2) Need, in terms of the population to be served and existing trails in the area.
(3) Compatibility with local, areawide, regional, or statewide plans.
(4) The acceptability of the proposed trail to property owners.
(5) The general acceptability of the proposed trail to the community at large.
(6) Benefits of multiple uses and recreational opportunities.
(7) Quality of the site.
(8) Economic benefits to the local area.
(9) Accessibility for persons with disabilities.
(10) Interference with any existing public utility use.
(11) Other criteria set by the board.
(c) The board shall determine the applicants to whom grants will be awarded.
As added by P.L.40-1995, SEC.3. Amended by P.L.158-1999, SEC.14.
Structure Indiana Code
Title 8. Utilities and Transportation
Article 4.5. Transportation Corridor Planning
Chapter 5. Recreational Trails Program
8-4.5-5-1. Purpose and Administration
8-4.5-5-3. Duties of Applicant
8-4.5-5-5. Eligibility Criteria
8-4.5-5-8. Waiver of Specified Costs
8-4.5-5-9. Waiver for Acquisition of Real Property
8-4.5-5-10. Request for Preconstruction Costs
8-4.5-5-11. Review and Evaluation of Applications
8-4.5-5-12. Funding Commitments
8-4.5-5-15. Limitations on Reimbursement
8-4.5-5-17. Reimbursement of Actual Project Costs
8-4.5-5-18. Real Property Acquisitions