Sec. 22.5. "Extraordinary cost" means the cost to a utility to relocate existing facilities that is either:
(1) more than ten percent (10%) of the total operating revenue received by the utility during the utility's most recent full fiscal year; or
(2) more than fifty percent (50%) of the total estimated cost of a proposed highway or bridge construction or improvement project.
As added by P.L.63-1992, SEC.1.
Structure Indiana Code
Title 8. Utilities and Transportation
Article 23. Indiana Department of Transportation
8-23-1-1. Application Throughout Article
8-23-1-7. Application of Additional Definitions
8-23-1-14. "Automobile Graveyard"
8-23-1-14.3. "Changeable Message Sign"
8-23-1-14.5. "Commerce Corridor"
8-23-1-16. "County Arterial Highway System"
8-23-1-17. "County Local Highway System"
8-23-1-20. "Directional and Other Official Signs and Notices"
8-23-1-20.5. "Electronic Billboard"
8-23-1-22.5. "Extraordinary Cost"
8-23-1-23. "Highway, Street, or Road"
8-23-1-24. "Information Center"
8-23-1-25. "Interstate System"
8-23-1-28. "Limited Access Facility"
8-23-1-30. "Main-Traveled Way"
8-23-1-31. "Municipal Arterial Street System"
8-23-1-32. "Municipal Local Street System"
8-23-1-34. "Road Paving Material"
8-23-1-36. "Scrap Metal Processing Facility"
8-23-1-39. "State Aid Director"
8-23-1-40. "State Highway System"
8-23-1-40.5. "Substantial Completion"
8-23-1-41. "Transportation Plan"
8-23-1-42.5. "Trimovement Sign"