Indiana Code
Chapter 43. Pilot Programs for Infrastructure for Public Use Electric Vehicles
8-1-43-5. "Make-Ready Infrastructure"

Sec. 5. As used in this chapter, "make-ready infrastructure" means the:
(1) structures;
(2) machinery;
(3) equipment;
(4) hardware;
(5) software;
(6) storage batteries; and
(7) other capital investments;
installed to connect charging infrastructure to an electric utility's distribution system, including any necessary upgrades to the electric utility's distribution system.
As added by P.L.94-2022, SEC.4.