Sec. 3.5. As used in this chapter, "related capital expenditures" includes capital costs that:
(1) the governing body reasonably believes will be incurred during the contract term;
(2) are part of or are causally connected to the conservation measures being implemented; and
(3) are documented by industry engineering standards.
As added by P.L.98-2002, SEC.5. Amended by P.L.168-2006, SEC.9.
Structure Indiana Code
Chapter 12.5. Guaranteed Savings Contracts; Energy Efficiency Programs Used by School Corporations
36-1-12.5-0.5. "Actual Savings" Defined
36-1-12.5-0.6. "Billable Revenues" Defined; "Billable Revenue Increases" Defined; "Revenues" Defined
36-1-12.5-0.7. "Causally Connected Work" Defined
36-1-12.5-1. "Conservation Measure" Defined
36-1-12.5-1.5. "Governing Body" Defined
36-1-12.5-2. "Guaranteed Savings Contract" Defined
36-1-12.5-2.5. "Industry Engineering Standards" Defined
36-1-12.5-3. "Qualified Provider" Defined
36-1-12.5-3.5. "Related Capital Expenditures" Defined
36-1-12.5-3.7. "Stipulated Savings" Defined
36-1-12.5-4. "Utility Efficiency Program" Defined
36-1-12.5-5.3. Certification of Subcontractor Required
36-1-12.5-5.5. Procedures for Issuance of Bonds by Political Subdivisions Not Applicable
36-1-12.5-6. Report Before Installation or Remodeling
36-1-12.5-7. Installment Payment Contracts; Maximum Period
36-1-12.5-8. Approval Required
36-1-12.5-9. Payroll Records Required; Inspection
36-1-12.5-10. Submission of Contract and Annual Report to Department of Local Government Finance
36-1-12.5-11. Contracts That Include Stipulated Savings
36-1-12.5-12. Improvements Not Causally Connected to Conservation Measure