Indiana Code
Chapter 9. Heating Oil Tank Closure
22-12-9-3. Duties of Contractors or Subcontractors

Sec. 3. A contractor or subcontractor proposing to convert a residential property from heating oil to another heat source shall inform the property owner of the requirements of this chapter and include in a contract for labor and materials the cost of:
(1) properly removing and disposing of all flammable or combustible liquids from a heating oil tank; and
(2) either:
(A) removing an outside filling pipe; or
(B) permanently securing the tank against accidental filling.
As added by P.L.131-1997, SEC.7.